-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Sinopec News Network reported at 15:36 on May 3, with the successful ignition of the No.
Since the equipment inspection and modification on April 1, Jiujiang Petrochemical has inverted the schedule, refined the work plan, accurately implemented the plan and arrangements, and went all out to promote the inspection and modification to ensure the completion of the high-standard maintenance and the completion of the project construction with high quality.
In response to the overhaul of the equipment with the most projects and the widest scope, the company has strengthened safety management and established a five-level supervision system consisting of safety and environmental protection and project authorities, territorial units, general contractors, construction units, and operation teams.
In addition, the company strengthened quality management, formulated 521 various maintenance and repair construction plans, clarified three-level quality control points, organized inspections, revisions, and quality management system reviews, hired a third party to perform quality management technical services, organized special inspections of equipment hidden dangers, and reviewed 36 batches 104 sets of important equipment were inspected, and the first pass rate of welding was 98.