echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Rubber Plastic News > Jinling Petrochemical Catalytic Oil Slurry Desolidification Project

    Jinling Petrochemical Catalytic Oil Slurry Desolidification Project

    • Last Update: 2022-11-07
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Recently, Jinling Petrochemical's I and III catalytic slurry desolidification projects have been successfully handed over, laying a good foundation for the high-end graphite material plant to start up
    .

    The high-end graphite material plant will be completed and put into operation in 2020.
    Due to the influence of the nature of the raw materials, the benefit has not been maximized.
    Therefore, Jinling Petrochemical decided to implement the oil slurry filter modification for the I and III catalytic cracking units

    .
    After the transformation is completed, the particles in the catalytic oil slurry can be effectively removed, so that the ash content of the filtered oil slurry meets the requirements of the raw material index of the high-end graphite material device, and the profit per ton of product is improved

    .

    In the face of difficulties such as the impact of epidemic prevention and control, the delayed arrival of key equipment, and the lack of construction personnel, the company's engineering department optimized the construction organization, cooperated with supervisors and production units to conduct regular safety inspections, implemented safety calls, solidified quality inspection points, and did a good job in homework.
    The previous JSA analysis, the operation disclosure after the change, and the management of dangerous operations are implemented to ensure that the safety, quality and progress of the project are fully controlled

    .
    After the project is handed over, all parties involved in the construction will continue to complete the final construction, strive to complete the rectification of all problems in the "three investigations and four determinations" on time, and fully cooperate to ensure the safe operation of the device

    .

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.