-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On June 30th, the groundbreaking ceremony of the pipeline project (Zigui section) of the Jiangnan refined oil reversing project in the Three Gorges Hub was held
in Zhongbazi Village, Maoping Town, Zigui County.
The Three Gorges Hub Jiangnan refined oil overturning project is composed of pipeline engineering, wharf engineering and oil depot engineering, starting from Yidu Zhicheng Oil Depot and ending at Zigui Oil Depot
.
The pipeline transports gasoline, diesel and aviation kerosene respectively, and the pipeline line is 120.
2 kilometers long, passing through Yidu, Dianjun, Yiling and Zigui, with a total of 5 monitoring valve rooms along the line, and 18 mountain tunnels crossed, with a project investment of 7.
6 billion yuan.
The main projects of the project in Zigui include the dam oil depot, the dam wharf and 13.
7 kilometers of pipelines, of which the pipeline project includes 1 valve chamber and 4 tunnels, passing through Jiuli Industrial Park, Maoping Town and other places, with an investment of 3.
8 billion yuan, accounting for about 50%
of the total investment of the entire project.
The pipeline project of the Jiangnan refined oil reversing dam project will play an important role in implementing the ecological protection, navigation safety, relief of congestion in the Three Gorges region, ensuring the replenishment and export of oil resources in the Sichuan-Chongqing region, and improving the strategic security of energy transportation, which will further stimulate the economic growth of Zigui and promote the formation of a comprehensive transportation system
for the Three Gorges Dam Flipping.