echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Chemical Technology > Japan's 150-meter offshore wind power plant was assembled

    Japan's 150-meter offshore wind power plant was assembled

    • Last Update: 2022-11-22
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Japan's Awaji Island will assemble offshore wind power equipment about 150 meters high in the port of Suhonto, and on the morning of July 2, it will start tugboat operations
    off the coast of Fukushima Prefecture.

    As a result of the recovery from the Great East Japan Earthquake, the Ministry of Economy, Trade and Industry (METI) will build offshore wind power plants off the coast of Fukushima Prefecture as part of the "Fukushima Floating Offshore Wind Farm Demonstration Research Business
    .
    " Considering the depth of the water and the surrounding environment, the first offshore assembly business
    in Japan will be carried out on the coast of Sumoto Port in early May.

    The 51-meter-wide and 48-meter-high floating body floats at sea, and in this regard, a tower with a height of about 86 meters and a windmill
    with a diameter of about 126 meters is installed.
    The electricity generated is 5,000 kilowatts, and the huge windmills will be completed
    by offshore wind power plants.
    On that day, four tugboats were connected by ropes and headed south to Osaka Bay
    at a speed of 6-8 kilometers per hour.
    If it goes well, it will reach Fukushima Prefecture
    on the 8th.

    Japan's Awaji Island will assemble offshore wind power equipment about 150 meters high in the port of Suhonto, and on the morning of July 2, it will start tugboat operations
    off the coast of Fukushima Prefecture.

    Offshore wind power equipment

    As a result of the recovery from the Great East Japan Earthquake, the Ministry of Economy, Trade and Industry (METI) will build offshore wind power plants off the coast of Fukushima Prefecture as part of the "Fukushima Floating Offshore Wind Farm Demonstration Research Business
    .
    " Considering the depth of the water and the surrounding environment, the first offshore assembly business
    in Japan will be carried out on the coast of Sumoto Port in early May.

    The 51-meter-wide and 48-meter-high floating body floats at sea, and in this regard, a tower with a height of about 86 meters and a windmill
    with a diameter of about 126 meters is installed.
    The electricity generated is 5,000 kilowatts, and the huge windmills will be completed
    by offshore wind power plants.
    On that day, four tugboats were connected by ropes and headed south to Osaka Bay
    at a speed of 6-8 kilometers per hour.
    If it goes well, it will reach Fukushima Prefecture
    on the 8th.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.