-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The German Machinery and Equipment Manufacturing Association VDMA and the German Wind Power Association Deutsche WindGuard recently announced that Germany added 1925 MW of onshore wind power capacity in 2021, an increase of 35%
compared with 1431 MW in 2020.
According to reports, in 2021, Germany built 484 onshore wind turbines, "expansion is increasing, but the pace of regional and overall expansion is too slow
.
" ”
Dennis Rendeschmidt, Managing Director of VDMA's Power Systems, said: "This is why Federal Minister for Economics Robert Habeck mentioned the need to accelerate expansion
.
Each federal state needs 2% of its land area as a minimum basis
for expanding wind energy in Germany.
”
Based on the evaluation of the winning projects and the pace of implementation of the tender system to date, the association expects the installed capacity to expand to 2.
3GW to 2.
7GW
in 2022.
"Process specification in the supply chain, simplified and planable transport permits, upgrades to transportation infrastructure, and flexible availability of labor are highly relevant
to achieving higher expansion goals," they said.
”
The German Machinery and Equipment Manufacturing Association VDMA and the German Wind Power Association Deutsche WindGuard recently announced that Germany added 1925 MW of onshore wind power capacity in 2021, an increase of 35%
compared with 1431 MW in 2020.
According to reports, in 2021, Germany built 484 onshore wind turbines, "expansion is increasing, but the pace of regional and overall expansion is too slow
.
" ”
Dennis Rendeschmidt, Managing Director of VDMA's Power Systems, said: "This is why Federal Minister for Economics Robert Habeck mentioned the need to accelerate expansion
.
Each federal state needs 2% of its land area as a minimum basis
for expanding wind energy in Germany.
”
Based on the evaluation of the winning projects and the pace of implementation of the tender system to date, the association expects the installed capacity to expand to 2.
3GW to 2.
7GW
in 2022.
"Process specification in the supply chain, simplified and planable transport permits, upgrades to transportation infrastructure, and flexible availability of labor are highly relevant
to achieving higher expansion goals," they said.
”