echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > Rubber Plastic News > Guangxi Petrochemical plans to build 1.2 million tons of ethylene, 400,000 tons of EVA, 700,000 tons of PE and 400,000 tons of PP

    Guangxi Petrochemical plans to build 1.2 million tons of ethylene, 400,000 tons of EVA, 700,000 tons of PE and 400,000 tons of PP

    • Last Update: 2022-09-16
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    On December 13, PetroChina Guangxi Petrochemical refining and chemical integration upgrade project carried out an EIA announcement.


    The following are the main contents of the EIA publicity


    Project Name: PetroChina Guangxi Petrochemical Company Refining and Chemical Integration Transformation and Upgrading Project

    Construction nature: New ethylene and refinery renovation

    Project construction site: The project is located in Qinzhou Petrochemical Industrial Park, Guangxi Qinzhou Port Technology Development Zone, Qinzhou City.


    The total investment of the project: 36,957,140,000 yuan


    Covering area: The new facilities of this project cover an area of ​​about 3,045,028 square meters, of which the newly added area is about 3,020,000 square meters, and the rest are carried out within the existing area of ​​Guangxi Petrochemical


    Production time: The designed annual operation time of the refinery unit is 8400h, the designed annual operation time of the chemical unit is 8000h, and the designed annual operation time of the polystyrene unit is 7200h


    Project capacity: The project has a new capacity of 1,368 people, with four shifts and two operations


    Construction Period: The total construction period of the project is about 36 months


    Construction content and scale: This project is to build a new 1.


    Relying on the existing 30 main production units in the refining block, a new 2 million tons/year diesel adsorption dearomatization unit and 400,000 tons/year carbon 2 recovery unit (including 100,000 tons of catalytic dry gas carbon 2 recovery unit and 400,000 tons of carbon 2 recovery unit) C2 recovery unit, built in the chemical zone)


    Construction scale of chemical block equipment:

    Construction scale of chemical block equipment:

    In the chemical block, 14 sets of main chemical plants are newly built, including 1.


    It mainly processes different types of cracked raw materials from the oil refining block to produce high-density polyethylene (HDPE), linear low-density polyethylene (LLDPE), ethylene-vinyl acetate (EVA), polypropylene (PP), butadiene, methyl alcohol tert-butyl ether (MTBE), butene-1, hexene-1, solution styrene-butadiene rubber (SSBR), styrene-butadiene-styrene (SBS), propylene oxide (PO), styrene (SM), polystyrene (PS) and other major chemical products


    Four new 5,000-cubic-meter styrene storage tanks will be built in the reserved area of ​​the dock storage area; in addition, the existing 13# berth benzene loading facility will be changed to a benzene unloading facility, and the 2 gasoline loading and unloading arms and 1 The diesel loading and unloading arms were changed to benzene, toluene and xylene loading and unloading arms respectively, and styrene loading facilities were added at berth 9#


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.