-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, Goa, India, proposed revising its state solar policy to include a 50% subsidy for small consumers of photovoltaic power plants up to 100 kilowatts to replace interest-free loan schemes
.
The Goa Energy Development Agency (GEDA) posted an update on its website and hoped the public would respond
positively.
The government shall provide a subsidy of 50% of the capital cost or benchmark cost (30% central ownership and 20% of the national shares) provided by the Ministry of New and Renewable Energy or the cost of GEDA reached through the tender process, whichever is lower
.
It is understood that after the solar system starts to supply power to the grid from 6 months, the state subsidy will gradually issue corresponding subsidies, including the battery cost
of the off-grid system.
:/, please indicate the source for reprinting)
Recently, Goa, India, proposed revising its state solar policy to include a 50% subsidy for small consumers of photovoltaic power plants up to 100 kilowatts to replace interest-free loan schemes
.
The Goa Energy Development Agency (GEDA) posted an update on its website and hoped the public would respond
positively.
The government shall provide a subsidy of 50% of the capital cost or benchmark cost (30% central ownership and 20% of the national shares) provided by the Ministry of New and Renewable Energy or the cost of GEDA reached through the tender process, whichever is lower
.
It is understood that after the solar system starts to supply power to the grid from 6 months, the state subsidy will gradually issue corresponding subsidies, including the battery cost
of the off-grid system.
:/, please indicate the source for reprinting)
/