echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > International Chemical > GE wins Pakistan coal power plant project

    GE wins Pakistan coal power plant project

    • Last Update: 2022-12-28
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    According to reports, the US General Electric Company announced that it has secured a $60 million coal power plant project
    .
    Advanced boiler technology and post-purchase services
    will be provided for a 330 MW coal-fired power generation project in the Thar region.

    Under the agreement, GE will supply advanced circulating fluidized bed boilers and steam turbine generator technology
    to the Thar Energy Ltd.
    power plant owned by TAL Energy Inc.
    (TEL).

    The plant will use local lignite from the Thar Block II mine and supply power
    to the national grid under a 30-year power purchase agreement.
    The 330 MW TEL plant is expected to begin commercial operations
    in March 2021.

    TEL is part of
    a 1,320 MW (four 330 MW power plants) integrated mining and power plant program under the China-Pakistan Economic Corridor program.
    Under the agreement, GE will provide critical services to support maintenance shutdowns, including spare parts supply, on-site inspections and consulting services to improve the operation of boilers and steam turbine generators at TEL power plants for a period of 12 years
    .

    :/, please indicate the source for reprinting)

    According to reports, the US General Electric Company announced that it has secured a $60 million coal power plant project
    .
    Advanced boiler technology and post-purchase services
    will be provided for a 330 MW coal-fired power generation project in the Thar region.

    General Electric

    Under the agreement, GE will supply advanced circulating fluidized bed boilers and steam turbine generator technology
    to the Thar Energy Ltd.
    power plant owned by TAL Energy Inc.
    (TEL).

    The plant will use local lignite from the Thar Block II mine and supply power
    to the national grid under a 30-year power purchase agreement.
    The 330 MW TEL plant is expected to begin commercial operations
    in March 2021.

    TEL is part of
    a 1,320 MW (four 330 MW power plants) integrated mining and power plant program under the China-Pakistan Economic Corridor program.
    Under the agreement, GE will provide critical services to support maintenance shutdowns, including spare parts supply, on-site inspections and consulting services to improve the operation of boilers and steam turbine generators at TEL power plants for a period of 12 years
    .

    :/, please indicate the source for reprinting)

    /
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.