-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
A few days ago, the National Energy Administration held an online press conference
for the second quarter.
At the meeting, Wang Dapeng, deputy director of the Department of New and Renewable Energy, introduced the construction and operation of
wind power.
In the first quarter of 2022, 7.
9 million kilowatts of new grid-connected wind power were installed nationwide, including 7.
54 million kilowatts of onshore wind power and 360,000 kilowatts
of offshore wind power.
From the perspective of the distribution of new installations, the "three north" regions accounted for about 70%, and the central and eastern regions and the southern regions accounted for about 30%.
As of the end of March 2022, the cumulative installed capacity of wind power in the country is 337 million kilowatts, of which 310 million kilowatts of onshore wind power and 26.
65 million kilowatts
of offshore wind power have been installed.
In the first quarter of 2022, the national wind power generation capacity was 183.
3 billion kWh, a year-on-year increase of 6.
2%; The utilization hours are 554 hours, and among the provinces and regions with high utilization hours, Yunnan 939 hours, Fujian 890 hours, and Sichuan 854 hours
.
The average utilization rate of wind power in China was 96.
8%, an increase of 0.
8 percentage points year-on-year, and the curtailment of wind power was about 6 billion kWh; the utilization rate of wind power in Qinghai and Mengxi increased significantly year-on-year, reaching 94.
1% and 89.
2%, respectively, an increase of 6.
2 and 2.
5 percentage points
year-on-year.
A few days ago, the National Energy Administration held an online press conference
for the second quarter.
At the meeting, Wang Dapeng, deputy director of the Department of New and Renewable Energy, introduced the construction and operation of
wind power.
In the first quarter of 2022, 7.
9 million kilowatts of new grid-connected wind power were installed nationwide, including 7.
54 million kilowatts of onshore wind power and 360,000 kilowatts
of offshore wind power.
From the perspective of the distribution of new installations, the "three north" regions accounted for about 70%, and the central and eastern regions and the southern regions accounted for about 30%.
As of the end of March 2022, the cumulative installed capacity of wind power in the country is 337 million kilowatts, of which 310 million kilowatts of onshore wind power and 26.
65 million kilowatts
of offshore wind power have been installed.
In the first quarter of 2022, the national wind power generation capacity was 183.
3 billion kWh, a year-on-year increase of 6.
2%; The utilization hours are 554 hours, and among the provinces and regions with high utilization hours, Yunnan 939 hours, Fujian 890 hours, and Sichuan 854 hours
.
The average utilization rate of wind power in China was 96.
8%, an increase of 0.
8 percentage points year-on-year, and the curtailment of wind power was about 6 billion kWh; the utilization rate of wind power in Qinghai and Mengxi increased significantly year-on-year, reaching 94.
1% and 89.
2%, respectively, an increase of 6.
2 and 2.
5 percentage points
year-on-year.