-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The picture shows the module construction site
The picture shows the module construction site
The Canadian LNG project plans to build 4 production lines, of which the first phase of the project plans to build 2 production lines with an annual output of 13 million tons
Different from the traditional pipe gallery and core process modules designed and built separately and docked at the production site, this project realized integrated construction for the first time.
According to the project manager Zhuang Hongchang, during the implementation of the project, CNOOC Engineering innovatively adopted large-tonnage deck double-system jacking technology and modular transport vehicle assembly technology, and innovatively applied a number of technological innovations such as super-large structure hoisting and 4D visualization construction.
Yu Yi, Chairman of Offshore Oil Engineering Co.