echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Chemicals Industry > International Chemical > Construction of the Mediterranean Medusa submarine cable system begins

    Construction of the Mediterranean Medusa submarine cable system begins

    • Last Update: 2023-01-06
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    AFR-IX, a submarine cable infrastructure service operator, has announced that the submarine cable system Medusa in the Mediterranean has begun to be deployed, with a total length of 8,700 kilometers, passing through 9 countries and 16 landing sites
    .

    According to reports, the Medusa submarine cable system will connect Portugal, Spain, Morocco, France, Italy, Algeria, Tunisia, Greece and Egypt
    .
    The system is equipped with 24 pairs of fibers, each with a design capacity of 20Tbps
    .

    AFR-IX said that the system will operate
    with open access in compliance with relevant local rules.

    According to the plan, all Atlantic and Western Mediterranean landing sites will be completed and commissioned by 2024, while the Eastern Mediterranean landing sites will be operational
    by 2025.


    AFR-IX, a submarine cable infrastructure service operator, has announced that the submarine cable system Medusa in the Mediterranean has begun to be deployed, with a total length of 8,700 kilometers, passing through 9 countries and 16 landing sites
    .

    According to reports, the Medusa submarine cable system will connect Portugal, Spain, Morocco, France, Italy, Algeria, Tunisia, Greece and Egypt
    .
    The system is equipped with 24 pairs of fibers, each with a design capacity of 20Tbps
    .

    AFR-IX said that the system will operate
    with open access in compliance with relevant local rules.

    According to the plan, all Atlantic and Western Mediterranean landing sites will be completed and commissioned by 2024, while the Eastern Mediterranean landing sites will be operational
    by 2025.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.