-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The picture shows the project start site
Sinochem News recently, the construction of the Tie-In module of the Mazan project contracted by Tianjin Port Free Trade Zone Enterprise Offshore Oil Engineering Co.
, Ltd.
(hereinafter referred to as "CNOOC Engineering") started on the Qingdao site
.
The Mazan project is a production increase and development project of the Marjan oil field under Saudi Aramco, located in the Arabian Gulf
In October 2019, CNOOC Engineering and McDermott won the EPCI general contract for the project in the form of a consortium.
According to the construction plan, the platform is expected to be ready for shipment in the first quarter of 2024
.
It is understood that the block to be constructed this time is a key 8-leg central connection platform with a floating weight of about 20,000 tons, which is used to connect important production and transportation facilities in the oil field
Wang Zhangling, President of Offshore Oil Engineering Co.