-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
[ Star Enterprise of Chemical Machinery and Equipment Network ] Recently, the epidemic situation in Shanghai has affected people's hearts.
Under the call of "one party is in trouble, all parties support", the "family" of China Pump Park actively responded to the call and contributed to the fight against the epidemic.
strength
.
Chemical Machinery Equipment Network Star EnterpriseUnder the call of "one party is in trouble, all parties support", the "family" of China Pump Park actively responded to the call and contributed to the fight against the epidemic.
strength
.
Nanfang Zhishui Shows "Southern Speed"
Nanfang Zhishui Shows "Southern Speed"At 8 p.
m.
on March 29, Nanfang Zhishui received a demand from Shanghai: the makeshift hospital urgently needs a batch of water supply equipment to solve the problem of domestic water
.
After receiving the demand, Nanfang Zhishui responded immediately, from production to delivery, it was closely linked
.
At 4:30 p.
m.
on the 30th, several sets of constant voltage and frequency conversion water supply equipment and control cabinets caught a truck bound for Shanghai
.
The equipment arrived at the scene that night.
They installed and debugged the equipment overnight, and completed the task with quality and quantity in the shortest possible time
.
m.
on March 29, Nanfang Zhishui received a demand from Shanghai: the makeshift hospital urgently needs a batch of water supply equipment to solve the problem of domestic water
.
After receiving the demand, Nanfang Zhishui responded immediately, from production to delivery, it was closely linked
.
At 4:30 p.
m.
on the 30th, several sets of constant voltage and frequency conversion water supply equipment and control cabinets caught a truck bound for Shanghai
.
The equipment arrived at the scene that night.
They installed and debugged the equipment overnight, and completed the task with quality and quantity in the shortest possible time
.
On the morning of April 8, Nanfang Zhishui received an order from Shanghai again, but this task was more complicated and difficult than the last time, and they needed an integrated box-type pumping station
.
Despite this, Nanfang Zhishui's response was still fast
.
At 10 p.
m.
that day, they designed product drawings suitable for the site.
At 5 p.
m.
on April 9, the related equipment was shipped
.
After the equipment arrived at the makeshift hospital safely, after three days and three nights of welding, installation and debugging, the equipment installation was completed at 7:00 am on the 13th, and more than 9:00 patients were admitted to the makeshift hospital that day
.
One day to design drawings, one day to complete material procurement and production to complete delivery, three days and nights to install and debug, this is the speed of the south!
.
Despite this, Nanfang Zhishui's response was still fast
.
At 10 p.
m.
that day, they designed product drawings suitable for the site.
At 5 p.
m.
on April 9, the related equipment was shipped
.
After the equipment arrived at the makeshift hospital safely, after three days and three nights of welding, installation and debugging, the equipment installation was completed at 7:00 am on the 13th, and more than 9:00 patients were admitted to the makeshift hospital that day
.
One day to design drawings, one day to complete material procurement and production to complete delivery, three days and nights to install and debug, this is the speed of the south!
Dongfang Pump Industry rushed to help the construction
Dongfang Pump Industry rushed to help the construction On the afternoon of April 7th, Dongfang Pumps was invited by China Construction Second Bureau to help the Shanghai National Convention and Exhibition Center Fangcang shelter hospital construction project, which required them to complete the production and delivery of 140 control cabinets before 8:00 a.
m.
on April 8th.
to the project site
.
m.
on April 8th.
to the project site
.
Dongfang Pump Co.
, Ltd.
acted quickly, actively coordinated and organized production, quickly assembled personnel, and raced against time to catch up with production
.
They overcame many difficulties, and after a night of hard work, they finally completed the production task with high quality and quantity at 3:00 a.
m.
on April 8, and shipped them to the makeshift hospital site at 4:00 a.
m.
in the morning
.
It took less than 13 hours from receiving the order to the completion of production, and they refreshed the speed of the East again!
, Ltd.
acted quickly, actively coordinated and organized production, quickly assembled personnel, and raced against time to catch up with production
.
They overcame many difficulties, and after a night of hard work, they finally completed the production task with high quality and quantity at 3:00 a.
m.
on April 8, and shipped them to the makeshift hospital site at 4:00 a.
m.
in the morning
.
It took less than 13 hours from receiving the order to the completion of production, and they refreshed the speed of the East again!
New Territories Pump Industry Contributes "New Territories Power"
New Territories Pump Industry Contributes "New Territories Power" On April 10, the New Territories Pump Industry received an urgent task - to complete the domestic water supply equipment and production and delivery tasks of the isolation ward of the Shanghai Circuit Fangcang shelter hospital within 48 hours
.
From design to commissioning and operation, they raced against time and made it fast.
At 16:00 on April 12, they completed the production task with high quality and quantity, and at 18:00 they were loaded and transported to the makeshift hospital site
.
At the scene, a number of professionals carried out 24-hour rush installation, and finally completed the task successfully
.
.
From design to commissioning and operation, they raced against time and made it fast.
At 16:00 on April 12, they completed the production task with high quality and quantity, and at 18:00 they were loaded and transported to the makeshift hospital site
.
At the scene, a number of professionals carried out 24-hour rush installation, and finally completed the task successfully
.
Not only that, the New Territories have also provided a series of solutions for the water supply of isolation rooms in the epidemic prevention area.
With high-reliability product quality and strong technical strength, they have helped epidemic prevention and control, and contributed to ensuring the safety of water in Fangcang shelter hospitals and blocking the spread of the virus.
"New Territory Power"!
With high-reliability product quality and strong technical strength, they have helped epidemic prevention and control, and contributed to ensuring the safety of water in Fangcang shelter hospitals and blocking the spread of the virus.
"New Territory Power"!
Haibei Electromechanical quickly "runs" to the front line
Haibei Electromechanical quickly "runs" to the front line Due to the spread of the epidemic, Hangzhou Binjiang Baimahu Fangcang shelter hospital is also under construction
.
As we all know, in the construction of Fangcang shelter hospitals, the biggest problem is to solve the collection, treatment and discharge of domestic sewage for isolated personnel, and the integrated prefabricated pumping station produced by Haibei Electromechanical has a short construction period, cost saving and high efficiency.
An excellent choice for makeshift hospitals
.
.
As we all know, in the construction of Fangcang shelter hospitals, the biggest problem is to solve the collection, treatment and discharge of domestic sewage for isolated personnel, and the integrated prefabricated pumping station produced by Haibei Electromechanical has a short construction period, cost saving and high efficiency.
An excellent choice for makeshift hospitals
.
In order to support the construction of Hangzhou Binjiang Baimahu Fangcang shelter hospital, Haibei Electromechanical cooperated from top to bottom, worked overtime, and strived to shorten the production time, so that the pumping station could be put into use in centralized isolation points faster
.
Finally, with the joint efforts of everyone, on the evening of April 9, the integrated prefabricated pump station was loaded and put into use in Hangzhou at the fastest speed, doing its part for the construction of the centralized isolation point.
.
.
Finally, with the joint efforts of everyone, on the evening of April 9, the integrated prefabricated pump station was loaded and put into use in Hangzhou at the fastest speed, doing its part for the construction of the centralized isolation point.
.
Shanghai Kaiquan and Shanghai work together to fight the "epidemic"
Shanghai Kaiquan and Shanghai work together to fight the "epidemic" In early April, Shanghai Kaiquan received tasks such as complete sets of water supply equipment, Internet fire fighting units, and sewage treatment devices required for the construction of a makeshift hospital in Shanghai.
Sewage discharge
, etc.
In order to ensure timely delivery, more than 550 employees implemented closed management in the factory area and worked overtime to catch up
.
Up to now, Shanghai Kaiquan has successfully supported the construction of 7 makeshift hospitals in Shanghai and surrounding areas including Jiading, Hongkou and Kunshan
.
Sewage discharge
, etc.
In order to ensure timely delivery, more than 550 employees implemented closed management in the factory area and worked overtime to catch up
.
Up to now, Shanghai Kaiquan has successfully supported the construction of 7 makeshift hospitals in Shanghai and surrounding areas including Jiading, Hongkou and Kunshan
.
Leo Pumps and Qidong keep "Shanghai" together
Leo Pumps and Qidong keep "Shanghai" together After receiving the construction task of Qidong Fangcang shelter hospital, Leo Pumps immediately understood their needs and provided systematic solutions and adapted products for the project construction on the same day
.
.
In the context of repeated epidemics, in order to fully guarantee the speed of supply, Leo Pump Co.
, Ltd.
coordinated various departments to give priority to expedited production of this product
.
Front-line workers also acted upon orders and worked overtime
.
Finally, with the joint efforts of everyone, the production period was reduced from the original 2 weeks to 1 week, and the time was shortened by half
.
, Ltd.
coordinated various departments to give priority to expedited production of this product
.
Front-line workers also acted upon orders and worked overtime
.
Finally, with the joint efforts of everyone, the production period was reduced from the original 2 weeks to 1 week, and the time was shortened by half
.
At 9:00 pm on April 11, all products were assembled and shipped
.
They arrived at the makeshift hospital on April 12 and completed the installation on the same day.
They once again demonstrated the responsibility and responsibility of the enterprise with high speed and high efficiency
.
.
They arrived at the makeshift hospital on April 12 and completed the installation on the same day.
They once again demonstrated the responsibility and responsibility of the enterprise with high speed and high efficiency
.
In addition, in order to strengthen the service management of the cabin hospital, Leo has specially formulated an emergency plan, appointed a special person to be responsible, and ensured that the emergency repair channel is unobstructed.
The normal water supply of the hospital contributes to the epidemic prevention and control work
.
The normal water supply of the hospital contributes to the epidemic prevention and control work
.
Garrett and Shencheng overcome difficulties together
Garrett and Shencheng overcome difficulties together On April 15, Garrett held a fund-raising event to support Shanghai's anti-epidemic efforts.
More than 300 employees, including Japanese personnel, participated in the fund-raising, raising a total of 29,885 yuan in donations
.
Garrett said that the donation will be used to purchase anti-epidemic materials through the Zhejiang Anfusheng Charity Foundation, and donate to the destitute people in Shanghai to help Shanghai fight the epidemic
.
More than 300 employees, including Japanese personnel, participated in the fund-raising, raising a total of 29,885 yuan in donations
.
Garrett said that the donation will be used to purchase anti-epidemic materials through the Zhejiang Anfusheng Charity Foundation, and donate to the destitute people in Shanghai to help Shanghai fight the epidemic
.
The country is in trouble and must be supported
.
This time, Garrett practiced their core values of "benefiting the earth and society" with practical actions!
.
This time, Garrett practiced their core values of "benefiting the earth and society" with practical actions!
"China Pump Park" was organized and initiated by Professor Mu Jiegang of Zhejiang University of Technology.
Its members are all leaders and elites from major pump companies and industry researchers.
Up to now, the number of members is still increasing every year
.
Its members are all leaders and elites from major pump companies and industry researchers.
Up to now, the number of members is still increasing every year
.
In the face of the epidemic, they acted decisively and never flinched.
This is the "Pump Industry Family" created by China Pump Park!
This is the "Pump Industry Family" created by China Pump Park!
Original title: China Pump Park takes another shot, cohesively defends "Shanghai"