-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Recently, the China National Petroleum Pipeline Administration announced that it has signed new contracts with two owners in the Iraqi market, namely the General Contracting (EPC) Phase I Pipeline Project of the Off-Station Project of the Rumaira Production Water Reinjection Facility and the Design, Procurement, Construction and Commissioning (EPCC) Project
The owner of the EPC Phase I pipeline project outside the Lumaila Production Water Reinjection Facility Station is Basra Energy Company, and the project is EPC general contracting mode, including 16 inches, 18 inches and other specifications of high-pressure water injection pipelines, totaling more than 50 kilometers, and has entered the preliminary preparation stage
Iraq Block 9 Water Source Water Plant and FRP Pipe Water Supply Pipeline EPCC Project, the owner is Kuwait Energy Basra Co.
The China Petroleum Pipeline Bureau said that the two project bids were carried out at the same time, facing different projects and owners