-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
A few days ago, the Energy Department of the Guizhou Provincial Bureau of Statistics released a report that the proportion of renewable energy power generation in the total installed capacity of the province in Guizhou Province increased by 4 percentage points
compared with the same period last year.
Data show that the technological development capacity of hydropower resources in Guizhou Province is about 23 million kilowatts, ranking sixth
in the country.
As of October, the installed capacity of hydropower in Guizhou Province has reached 22.
83 million kilowatts, and the development of hydropower resources is close to saturation; The installed capacity of wind power was 5.
8 million kilowatts, an increase of 17.
1% over the same period last year; The installed capacity of solar power generation was 10.
57 million kilowatts, an increase of 97.
6%
over the same period last year.
From January to October, the wind power generation capacity of industrial enterprises above designated size in Guizhou Province was 8.
421 billion kWh, a year-on-year increase of 2.
1%; Solar power generation was 5.
632 billion kWh, a year-on-year increase of 58.
5%, accounting for 1 percentage point
of the above-mentioned power generation.
A few days ago, the Energy Department of the Guizhou Provincial Bureau of Statistics released a report that the proportion of renewable energy power generation in the total installed capacity of the province in Guizhou Province increased by 4 percentage points
compared with the same period last year.
Data show that the technological development capacity of hydropower resources in Guizhou Province is about 23 million kilowatts, ranking sixth
in the country.
As of October, the installed capacity of hydropower in Guizhou Province has reached 22.
83 million kilowatts, and the development of hydropower resources is close to saturation; The installed capacity of wind power was 5.
8 million kilowatts, an increase of 17.
1% over the same period last year; The installed capacity of solar power generation was 10.
57 million kilowatts, an increase of 97.
6%
over the same period last year.
From January to October, the wind power generation capacity of industrial enterprises above designated size in Guizhou Province was 8.
421 billion kWh, a year-on-year increase of 2.
1%; Solar power generation was 5.
632 billion kWh, a year-on-year increase of 58.
5%, accounting for 1 percentage point
of the above-mentioned power generation.