Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Since the beginning of summer, Anqing Petrochemical's Acrylic Fiber Division has taken a variety of measures to continuously enhance the safety awareness and work responsibility of employees, and continuously improve measures to optimize equipment operation to ensure that the installation is safe and stable throughout the summer
.
The device puts into use the self-circulating cooler of vinyl acetate and ethyl mercaptan in time to ensure the safety and stability of the materials supplied to the kettle
.
With the main purpose of preventing environmental accidents, we will increase the monitoring of downstream sewage, increase the frequency of sampling, strictly control the liquid level of the 11A and 11B pools, and stabilize the external discharge
In view of the characteristics of summer production, the process particularly requires strengthening the quality of on-site inspections, so that problems can be detected and dealt with early.
In the early morning of June 11, the team inspections promptly found abnormal display of the termination APH meter, which avoided the fluctuation of the 2% alkali addition.
Stabilized the normal production of the subsequent sections
.
Cooperate with the LDAR inspection unit and arrange dedicated personnel to actively do a good job in the detection of major dangerous source leaks, focus on key locations, and immediately record and eliminate detected abnormal locations, which effectively guarantees safe production
The device requires each team to carefully perform the daily cranking work of each pump equipment, and promptly contact and deal with abnormal situations found during the cranking process to ensure that the equipment is in good condition
.
The verification work of the chilled water safety valves of polymerization reactor A and C was completed as planned, which provided a strong guarantee for the safe operation of the polymerization reactor
For high-temperature weather, it is particularly emphasized to strengthen equipment inspection, especially equipment in key areas.
Temperature and vibration measurement equipment must be carried during inspections, and abnormalities should be reported and inspected in time
.
On June 6, the team inspected and found that the temperature of the mechanical seal at the end of the titanium dioxide homogenate pump 3-15-8.
The device actively implemented the relevant requirements of the "Three Three" Issues Management and Control and the Situation of Reconsideration of the Suspension and Rectification of Bilateral Operations, Inspection and Maintenance Operations recently issued by the Acrylic Fiber Department.
(He Wensheng talks about Lei)