-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Petroleum & Chemical News Network reported on April 26 that a single unit of the Sino-Russian East Route Project of the Petroleum Engineering Construction Company Jianghan Oil Construction Company welded 52 crossings of 1219 mm diameter pipelines every day.
Facing the requirements for the construction of large-diameter, high-grade steel, high-pressure, and intelligent long-distance pipelines, Jianghan Oil Construction Company has comprehensively improved its engineering construction capabilities through measures such as professional training, equipment configuration and upgrading, and construction of intelligent chemical sites.
In order to ensure the smooth implementation of the overall construction schedule of the project, the company combines the characteristics of fully automatic welding operations to continuously strengthen outsourcing work to overcome difficulties such as house demolition, relocation and land acquisition, and to achieve continuity of the operation surface of the construction unit.
Up to now, the construction project department of the company has welded a total of 9.