-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
On December 21, 30 newly installed charging terminals in the district governance compound of Kaifu District of Changsha City completed the inspection and collection of the body, which can provide charging self-service for electric vehicles for government staff and surrounding residents, which also means that the district government is the first in the city to complete the installation
of new energy charging facilities.
The 30 charging terminals are centrally installed on the parking pad
at the northern end of the district management compound in Kaifu District.
The reporter saw at the scene that the charging terminal is not as high as the trolley tire The shape is simple, just open the plastic cover plate can be connected to the plug self-service charging, these charging terminals by an intelligent master control box responsible for daily "command", in the "rest" state when the charging terminal is not charged, there is no rain and waterproof and other safety hazards
.
It is reported that as an open organ compound, these charging terminals not only serve the electric vehicles of government staff, but also provide charging self-service
for surrounding residents.
On December 21, 30 newly installed charging terminals in the district governance compound of Kaifu District of Changsha City completed the inspection and collection of the body, which can provide charging self-service for electric vehicles for government staff and surrounding residents, which also means that the district government is the first in the city to complete the installation
of new energy charging facilities.
The 30 charging terminals are centrally installed on the parking pad
at the northern end of the district management compound in Kaifu District.
The reporter saw at the scene that the charging terminal is not as high as the trolley tire The shape is simple, just open the plastic cover plate can be connected to the plug self-service charging, these charging terminals by an intelligent master control box responsible for daily "command", in the "rest" state when the charging terminal is not charged, there is no rain and waterproof and other safety hazards
.
It is reported that as an open organ compound, these charging terminals not only serve the electric vehicles of government staff, but also provide charging self-service
for surrounding residents.