-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Network
News: After Guangzhou, a few days ago, the city of Zhangzhou also issued the "City of Luzhou City, the city of building waste disposal management measures" to manage the construction, decoration of garbage disposal problems. Measures provide that decoration garbage can not be mixed into household waste, to be stacked in the property or community designated places, otherwise the maximum fine of 50,000 yuan!
! Construction waste, decoration garbage is not what you want to pour, want to pour can be poured. Recently, the city of Zhangzhou issued the "Measures for the Management of the Disposal of Municipal Construction Waste" (hereinafter referred to as the "Measures"), the urban construction waste generation, transportation, transit, backfilling, waste, utilization and other activities made relevant provisions, violators can be fined up to 100,000 yuan. Among them, the decoration of garbage also put forward a clear request, can not be mixed into the household garbage, to be stacked in the property or community designated places, such as "willy" pour, the maximum penalty of 50,000 yuan fine.
three major problems difficult to deal with construction waste
what is included in the construction waste? City Administration, the relevant person in charge of the slag management department told reporters, where the new construction, alteration, expansion and demolition of all kinds of buildings, structures, roads, pipe networks and residential decoration and decoration of houses, such as the process of waste, waste and other waste. For example, usually see the construction of the project, housing expropriation, decoration and decoration and other garbage generated.
, at present, there are many difficulties in the disposal of municipal construction waste in Zhangzhou City. The first is that the construction unit or construction unit has not assumed the corresponding disposal responsibilities, only by contracting the right to dispose of construction waste to individual slag owners, regardless of where they dump construction waste, and whether the owner of the transport, treatment is appropriate. Second, Luzhou City does not yet have a construction waste disposal site, mostly stacked in temporary waste disposal site, there are some construction waste to take the way of deployment, such as the project needs earth to be able to bring other projects of earth over.
addition, the most important point is that the urgent problem to be solved is that the construction waste transport unit is not standardized. At present, the construction waste clearance is more than 35 groups of individual households to pull slag, not only do not install closed devices in accordance with the provisions, resulting in drip leakage, but also do not dump to the designated location, affecting the appearance of the city, so to the standard management brings great difficulty, but also the "Measures" the first solution to the problem.
construction waste transportation will be the
operation, construction waste transportation from "scatter" to the company operation has become the only way.
Measures, it is clearly stipulated that units engaged in the transport of construction waste must have the legal personality of an enterprise and that individual and individual industrial and commercial households are prohibited from engaging in the transport of construction waste. At the same time, the transport vehicles are also required to have fully enclosed transport machinery or cloth, mats, etc. to be closed, the vehicle also needs to install driving and loading and unloading recorders and the corresponding construction waste classification transport equipment.
According to the introduction, for the company-operated transport vehicles, the city management department requires a unified appearance, unified logo, they will be all construction waste transport vehicles of transport enterprises to register, and to each vehicle issued a transport license, while the transport enterprises and registered vehicles to the public for social supervision and unified management.
Transport garbage vehicles are prohibited from taking mud on the road
In most people's impression, vehicles transporting construction waste are mostly dirty and grey, but such appearances must be improved as required.
The Measures require that the discharge, transportation and disposal of construction waste in Zhangzhou City shall be subject to an approval system, obtain the qualification for the transportation and disposal of construction waste, and shall be approved before discharge, transport or disposal, and shall not be discharged, transported or eliminated without approval.
For construction units, construction units ultra-high, overloaded construction waste, as well as dirt trucks with mud on the road, debris leakage and other issues, the Measures provide that construction construction site, construction waste disposal site should be in accordance with the provisions of the construction wall (fence), vehicle flushing equipment, water pool and other anti-fouling facilities, and the construction site entrance and exit roads hardened, timely clearance of construction waste generated during the construction process. Units engaged in the transportation of construction waste shall arrange for the centralized parking of garbage transport vehicles and strengthen the management of transport vehicles to ensure that such devices as the closure and monitoring of transport vehicles are in good working order and to prevent the dispersion, scattering and dripping of construction waste during transport. Construction units shall be equipped with the necessary construction waste handling management personnel and cleaning personnel, on-site supervision of construction waste shipment, vehicle flushing, timely clean-up of scattered, scattered construction waste.
The new regulations specify the relevant regulations that must be followed for the transportation and disposal of construction waste, but there are also corresponding penalties for those who dare to take the plunge
.
shall be fined up to 100,000 yuan if they dispose of construction waste without authorization or if they dispose of construction waste beyond the approved scope." "The person said that the construction units to 10,000 yuan to 100,000 yuan or less fines, construction units, the transport of construction waste units to 5000 yuan to 30,000 yuan or less fines. At the same time, who alters, resold, rents, lends or other forms of illegal transfer of approval documents for the disposal of urban construction waste shall be fined between 5000 yuan and 20,000 yuan.
The Measures stipulate that if the construction site or the construction waste removal site does not take effective measures to prevent and control dust as required, resulting in pollution of the atmospheric environment, the administrative department shall order it to make corrections within a time limit and shall be fined not more than 20,000 yuan; If the local environmental protection regulations are not met within the time of the overdue period, they may be ordered to stop work for rectification. If the construction unit does not promptly clear the construction waste generated during the construction of the project, causing environmental pollution, the city administration department shall order the correction within a time limit, give a warning, and shall be fined from 5000 yuan to 50,000 yuan or less.
Littering decoration garbage maximum fine of 50,000
For a long time, Luzhou City residents home decoration, shop decoration waste has been in disorderly management of the situation, decoration garbage dumped at will, pollution of the environment, but also affected the city's appearance.
"Measures" on the decoration of garbage put forward a clear request, that is, residents should be decorative decoration of the house in the process of building waste and household waste collected separately, and stacked in the property service units or community housing committee designated places. If any unit or individual dumps, throws or piles construction waste at will, the city administration department will order the correction within a time limit, give a warning, and impose a fine of 5,000 yuan to 50,000 yuan or less on the unit, and a fine of 200 yuan or less on the individual.
If a unit or individual still mixes construction waste into household waste, or mixes hazardous waste into construction waste, or if it establishes an abandoned site without authorization to be subject to construction waste, the unit shall be fined not less than 3000 yuan and the individual shall be fined not more than 200 yuan; If there is a third act, the unit shall be fined between 5000 yuan and 10,000 yuan, and the individual shall be fined not less than 3000 yuan.