    Winter paint application considerations

    • Last Update: 2022-12-04
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    As the temperature across the country has begun to drop significantly, some areas have begun to heat in winter, and have gradually entered the winter construction stage
    .
    Please note the following winter precautions:

    Construction environment:

    1.
    If the temperature is greater than 5 °C and the temperature of the base surface of the construction surface is greater than 5 °C, if the temperature of the base surface is less than 5 °C, or when it freezes, frosts, or snows, it is strictly forbidden to build internal and external wall latex paint, wood paint, floor paint and other products
    .

    2.
    During the anti-corrosion coating of steel structure, the temperature should be higher than the dew point temperature above 3 degrees Celsius and the coating should be coatingol.
    com
    online.

    3.
    It is recommended that the substrate temperature of the interior wall emulsion paint construction be greater than 10 degrees Celsius to avoid poor film formation and cracking
    caused by too low temperature during film formation after construction.

    4.
    Pay close attention to weather changes, the relative humidity of the environment should be less than 85%, and it is strictly forbidden to build exterior wall products
    on rainy days.

    5.
    Stop operations
    24 hours before the onset of the cold snap.

    Base Conditions:

    If the environmental conditions meet the requirements, and the moisture content and alkalinity of the substrate meet the requirements, the construction
    can be carried out.

    1.
    When constructing internal and external wall latex paint, the moisture content of the wall is required to be less than 15% (the national requirement is less than 10%); When applying solvent-based coatings, such as epoxy floors, please operate according to the product manual, and the moisture content of the concrete base layer should be less than 8%; When applying wood paint, the moisture content of wood should be less than 12%.

    2.
    The wetted base surface is not easy to dry under low temperature and high humidity, so be sure to carry out the construction after testing the moisture content of the
    base layer.

    3.
    If the base layer freezes, frosts, or condensation, painting construction
    is not permitted.

    4.
    After the rain break, the substrate is tested for moisture content and alkalinity, and the temperature and relative humidity of the environment are tested, as long as the conditions are met, workers can be immediately organized to carry out surprise construction
    .

    Product construction:

    1.
    In winter, the construction should be carried out
    at 10 am ~ 15 pm.

    2.
    During the drying of the coating, in case of rain, the necessary shading measures should be used to protect
    the finished product.

    3.
    The control points of winter coating construction are: pay attention to the weather forecast and weather conditions at any time, regularly test the moisture content and alkalinity of the substrate, and test the temperature and relative humidity of the environment, as long as the conditions are met, workers can be immediately organized to carry out surprise construction
    .
    However, construction should be stopped 24 hours before cold snap, rain and snow
    .

    Interior and exterior wall coatings:

    1.
    Avoid one thick application
    .
    If airless spraying is used to apply the interior wall latex paint, the coating rate should be greater than 9 square meters / liter to avoid slow drying and cracking
    caused by too thick paint film.

    2.
    Indoor heating in winter will cause the relative humidity of the air to be very low, and the drying of the internal wall latex paint too quickly may lead to heavier rolling marks and brush marks, which can be improved by appropriately increasing the air humidity, rather than by excessive dilution with water
    .

    3.
    Elastic middle layer paint, texture paint, real stone paint due to the thicker paint film and slower drying, the selection of construction conditions must be more stringent, and the recoating interval should be greater than 48 hours
    .

    4.
    Real stone paint construction and film formation are relatively sensitive to ambient temperature, and cross-seasonal construction should be avoided to avoid color difference
    .

    5.
    Extend the drying time of the coating as much as possible; Overnight recoats are generally recommended
    .

    HPC Products:

    1.
    The decrease in temperature will lead to an increase in viscosity, and the proportion of diluent can be appropriately increased to adjust the viscosity of paint application, but it should not be over-diluted
    .

    2
    .
    Stirring is generally carried out indoors and allowed to stand for more than 30 minutes.
    Polyamide epoxy HPC products, such as D231, D224HS, D201, D4030, D4406, etc.
    , should extend the curing time
    after mixing.

    3.
    Low-temperature construction of steel structure anti-corrosion coating: Epoxy primer applied below 10 °C, or polyurethane topcoat below 5 °C, low-temperature accelerator should be used, and the specific use ratio and use method are detailed in the "Instructions for the Use of Low Temperature Accelerator"
    .
    Even if a low-temperature accelerator is added, the limit is -4°C at the base surface temperature, and it is recommended to construct above 0°C to
    achieve better performance.

    4.
    The temperature of the floor coating construction base is required to be above 5 °C; (It should be noted that even with indoor heating, the temperature of the wall and floor will rise much lower than the temperature)

    5.
    When the low viscosity of solvent-free floor coating is too high due to excessive temperature, the construction operation should be stopped and no diluent should be added
    .

    Wood paint:

    1.
    The film-forming speed of wood paint construction is mainly affected by temperature, and the proportion of curing agent cannot be increased, which will cause the paint film to crack and peel off
    .

    2.
    The drying speed of oily wood paint will be much slower in winter, try to increase the temperature of the construction site to ensure the dry speed, and pay attention to the construction of thin coating multiple times, and avoid one-time thick coating at low temperatures or the use of "wet touching wet" process;

    3
    .
    Try to use sealing primer to close the board during wood paint construction to reduce whitening.

    4.
    During the application of waterborne wood paint, the drying time of each coating should be extended to ensure that the paint film dries thoroughly to avoid whitening
    of the paint film in the future.

    5.
    Avoid polishing wood paint with water milling, because the temperature is too low and dry in winter, which is more likely to cause whitening and other drawbacks
    .

    Stockpile:

    1.
    It is necessary to do a good job of antifreeze and safety protection measures for storing paint warehouses, and do a good job in the protection
    of finished products and semi-finished products.

    2.
    Paint on site should not be stacked
    in the open air.

    3.
    Please refer to the various product manuals
    for the storage methods and storage conditions of different coatings.

    Other Supplements:

    1) According to the regulations, the average daily temperature is lower than 10 degrees Celsius for five consecutive days, that is, the winter construction
    begins.

    2) The basic premise of the use of coating products is:

    -- The base layer is not frost damaged

    -- The basic premise of dry, clean and firm surface of the base layer, flatness, straightness of yin and yang angles, detailed treatment of the installation node of decorative components and the handover of the finishing surface, etc.
    , are the key points
    to ensure the beauty of the building.

    3) From the beginning of the application of the paint to the actual drying of the paint film must be met - not to suffer from condensation, low temperature frost damage, rain and snow, frost and other damage
    .
    (Non-varnish surface dry)

    4) During the winter application period, general latex paint, especially elastic, texture, and real stone paint products basically cannot be constructed
    .
    If the weather permits, it is necessary to rush work, and it should be coordinated in writing in advance to ensure the quality effect
    after completion.


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.