    What should be paid attention to in the valve of the high and low temperature cycle temperature control system

    • Last Update: 2022-05-04
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    In industries that require temperature, high and low temperature cycle temperature control system equipment has been widely used, which can realize two functions of heating and cooling
    .

    During cooling and heating, the temperature change in the thermostat can be realized by the circulation of the fluid medium (refrigerant), so as to achieve the temperature required by the process
    .


    1.
    What is the function of the valve of the high and low temperature cycle temperature control system 1.
    The valve is used to control the flow and direction of the refrigerant
    .

    Valves are required for closing and starting
    .

    Valves should be installed where they can be easily removed and serviced
    .

    Set up various valves, pay attention to the direction of refrigerant flow, and do not install them upside down
    .

    2.
    What problems should be paid attention to when installing the valve 1.
    The thermal expansion valve used in the high and low temperature cycle temperature control system requires horizontal installation
    .

    Note the inlet and outlet connections of the valve, usually with filters
    .

      2.
    When installing a flanged valve, the flanges and flanges of the valve need to be padded with high-pressure asbestos plates, and the thickness should be determined according to the depth of the flange groove on the valve
    .

    If the valve is large and the groove is deep, a thicker asbestos plate should be used to avoid gaps between the concave and convex contact surfaces between the two, and the sealing is not strict
    .

    Assemble flanged valves to ensure that all bolts are evenly stressed, otherwise the concave-convex interface will be easily biased
    .

      3.
    Install the stop valve so that the refrigerant flows from the bottom of the valve to the top
    .

    When installed on a horizontal pipeline, the valve stem should be vertical or inclined at a corresponding angle to prevent the valve stem from going down
    .

    If the valve position is not close or higher, it can be installed horizontally for easy operation
    .

    The spool should open automatically
    .

    The poppet check valve spool should be perpendicular to the horizontal plane
    .

    The valve core plate of the rotary check valve should be rotated and the valve core plate should be installed horizontally
    .

    4.
    The integrated valve of the high and low temperature cycle temperature control system should be directly installed on the stop valve at the outlet of the equipment.
    The arrow of the valve should be consistent with the flow direction of the working medium.
    The solenoid valve should be installed horizontally at the outlet of the equipment and installed in the same position
    .


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.