-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
What do I need to pay attention to in the installation of the oil and gas reservoir lightning monitoring and early warning system? 【FT-LD1】 د تیلو او ګازو ډیپو لپاره د بریښنا د څارنې او د مخکینۍ خبرتیا سیسټم په نصبولو کې څه باید پاملرنه وشي؟ د Lightning early warning system is a fully digital electric field detection and lightning early warning platform, its core electric field detection structure is based on the principle of charge sensing, the use of MEMS (micro-electromechanical system) technology development, no motor and other easy to wear and move mechanical components, with small size, low power consumption, high reliability, easy to integrate and other outstanding advantages
.
The system adopts electric field differential combined with threshold threshold optimization lightning early warning algorithm, compared with the conventional threshold threshold method, the probability of avoiding false alarm problems caused by human interference (rainy days / strong winds / snow days / dust) and so on is further improved
.
The lightning early warning system has accurate early warning, easy networking, and convenient installation, and is mainly oriented to the application needs
of atmospheric electric field detection and short-term warning in the fields of aerospace and national defense, meteorology, petroleum and petrochemical, power grid, scenic spots, mines, oil depots, and military.
Installation precautions 1.
Lightning warning probe should be installed on a sunny day 2.
Lightning warning probe should be installed in the outdoor without obstruction and surrounding unobstructed 3.
Do not install at the generator exhaust outlet, next to the telephone pole and under the high voltage line 4.
Under abnormal circumstances, when protruding from the ground, near the antenna pole or other equipment, Field strength and its test data may be interfered with 5.
In the wired mode, the wiring distance from the outdoor electric field instrument probe to the indoor host is not recommended to exceed 100 meters6.
More please consult the company 7.
If there is a parameter update, without prior notice, the technical interpretation right belongs to the company