echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > What details are needed when the small heat and cold machine is turned on

    What details are needed when the small heat and cold machine is turned on

    • Last Update: 2022-05-06
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    After many users buy a small cooling and heating all-in-one machine, they often do not notice the details that need to be paid attention to when the device is turned on
    .

    It is necessary to check whether there are few pieces of the product, there is loss, and whether it can be used normally is the same, so the following editor will explain to you what details you need to pay attention to when starting the small hot and cold all-in-one machine
    .


    1.
    Check whether the packaging is damaged and whether the anti-fall mark on the packaging box is normal; check the type and quantity according to the contents in the "Packing List"; 2.
    Please be careful not to damage the test box when unpacking, and also need to remove the compressor 3.
    Adjust the level after the small cooling and heating integrated machine is placed in the position, and reserve at least a certain distance for the maintenance space of the test box; 4.
    Open the electrical control cabinet to check whether the components have loose terminals; the water box of the waterway Whether there is damage, whether the fixing screws are loose, connect the power line and grounding line after checking; 5.
    Connect a water pipe to the drain joint of the small heat and cold integrated machine.
    The length of a single water pipe cannot exceed 1 meter, and the The outlet of the water pipe extends into the floor drain.
    If there is no floor drain, the water box can be placed directly under the joint; 6.
    The heat pipe of the small cooling and heating integrated machine dissipates heat.
    If it is running at high speed, there is suddenly no fluidity of water and a lot of heat Evaporation cannot be carried out immediately, resulting in a very rapid rate of temperature increase
    .

    When the temperature exceeds the high temperature zero point, the small cooling and heating unit will maintain itself according to the shutdown method
    .

    The above points are what the editor told you about the details that need to be paid attention to when the small hot and cold integrated machine is turned on.
    After all the above checks are normal, the small hot and cold integrated machine can be run.
    I hope it can help you better.
    to use this product
    .


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.