Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
1.
1.
The base surface is flat-corner protection-flexible putty (leveling)-division, elastic line, trace line-thick tape, fixed belt-roller coating interface agent-construction of the intermediate layer according to the design requirements- —Rolling colored primer—spraying colorful paint (1~3 times, main application)—repairing, tearing tape—rolling cover paint—rolling top coat—finished product
2.
The base surface is flat-divided into grids, elastic thread, sticking thick tape-fixed tape, corner protection-scraping mortar putty (modeling)-scraping flexible putty (leveling)-sanding, watering, tearing tape- —Rolling interface agent—rolling colored primer—closing the non-spraying part—spraying colorful paint (1~3 times, main coating)—sanding, repairing—rolling cover paint—rolling top coat— Glue, finished product
3.
The base surface is smooth-corner protection-scraping mortar putty-scraping flexible putty (leveling)-dividing, elastic line, drawing line-sticking thick tape-rolling interface agent-rolling colored base Paint-spray colorful paint (1~3 times, main application)-repair, tear tape-apply cover paint-roll top paint-finished product
4.
The base surface is treated according to the design requirements-roller coating interface agent-construction of the intermediate layer as designed Topcoat-finished coating online coatingol.
Second, the specific operation method of colorful paint construction
Grassroots treatment
1.
2.
3.
4.
Scraping putty
1.
2.
3.
Polish the surface of the putty with water sanding to remove the floating ash and burrs on the surface
.
4.
Under normal circumstances, the putty should be cured after the construction is completed, so that the base layer meets the construction requirements (moisture content <10%, PH value <10), generally curing at a temperature of about 23 ℃ for no less than half a month ( Except for rainy weather)
.
5.
Flexible smooth glue batch scraping: Normally 2-3 times, under the environment of about 23℃, the interval of each construction is 12 hours, and it is dried for 24 hours after completion
.
6.
Surface polishing: Polish the surface with fine water sand to make the surface smooth and provide a good base surface for coating construction
.
Apply primer
1.
Primer seal: evenly apply the special seal primer 1-2 times, using wool roller or spray gun
.
2.
The primer is completely dry (it takes about 6 hours in an environment of about 23°C)
.
Spray colorful paint
1.
Use a special spray gun to evenly spray water-in-water or sand-in-water 1-2 times
.
(The caliber of water-in-water is generally around 3.
0, and that of sand-in-water is 3.
5-4.
0)
2.
In an environment of around 23°C, each construction requires an interval of 12 hours
.
3.
After spraying and drying, the drying time is 24 hours
.
Finish paint construction
1.
Use a spray gun to evenly apply overcoat varnish 1-2 times
.
2.
In an environment of around 23℃, the interval between each pass is 4-6 hours
.
Precautions for coating construction
1.
After opening the barrel, try to use it up at once
.
2.
Do not stir the colorful paint with force
.
3.
Do not dilute with water
.