-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Coatings Network
News: The Ministry of Industry and Information Technology issued a document "on the issuance of steel, petroleum and chemical, building materials, non-ferrous metals, light industry enterprise energy management center construction implementation plan notice" (Ministry of Industry and Information Technology Section (2015) No. 13).
In order to implement the Energy Conservation Law, improve the energy management system of enterprises, strengthen the government's energy conservation supervision means, and improve the level of energy management of enterprises, we have formulated the implementation plan for the construction of energy management centers for enterprises in the steel, petroleum and chemical, building materials, non-ferrous metals and light industry industries.
The document includes the Implementation Plan for the Construction of energy Management Centers for Petroleum and Chemical Enterprises, which includes the
coatings
industry in the key areas of energy consumption in the petroleum and chemical industries, and the implementation plan for the construction and transformation of the 200 An enterprise energy management center, containing soda, paint, inorganic salt and rubber enterprises about 30, in addition, in the basic requirements also put forward, chlor-alkali, electro-stone, soda, paint, inorganic salt, rubber enterprise annual comprehensive energy consumption is not less than 200,000 tons of standard coal.
The declaration of the center, in line with the principle of voluntary enterprises, enterprises that meet the basic requirements may submit to the provincial industrial authorities an application for the record of the construction of the energy management center, and submit a basic energy consumption report issued by a qualified third-party institution (local energy conservation supervision agency, etc.), which shall include the basic production operation of the enterprise before the construction of the energy management center, energy consumption, energy conservation and emission reduction work, etc., and shall be signed and sealed by the legal representative. After the completion of the record, the enterprise shall independently build the energy management center according to the construction implementation plan. After the construction is completed and put into operation, the enterprise may, in accordance with the principle of territory, submit an acceptance application report to the local provincial industrial authorities, which shall include the basic situation of the enterprise, the basic construction content of the energy management center, the operation, energy conservation benefits, economic benefits, information reporting, the construction of the energy management system, the final investment accounts and other contents signed by the legal representative and stamped with the official seal.
provincial industrial authorities shall screen eligible enterprises for filing according to the scope and conditions of support. After receiving the application for acceptance by the enterprise, the provincial industrial department entrusts qualified third-party institutions (local energy-saving supervision institutions, etc.) to conduct on-site audits and issue audit reports; The Ministry of Industry and Information Technology organizes provincial industrial authorities to carry out acceptance, according to the enterprise acceptance application and third-party audit report, organizes experts to evaluate the implementation of the construction of the energy management center by reference to the acceptance criteria, and conducts spot checks on the spot to form acceptance conclusions. According to the acceptance conclusions, the Ministry of Industry and Information Technology, together with the local industrial authorities, will make use of the various fiscal and tax preferential policies that have been introduced by the state to promote energy conservation and emission reduction of enterprises, and give incentives or credit support to enterprises that have passed the acceptance.