-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
High and low temperature test chamber has now penetrated into many manufacturers, and high and low temperature test chamber has become a necessary equipment for their testing products, and it is also very important to have some details when using the operation of the equipment, they are likely to cause the high and low temperature test chamber to not start normally, so we should pay attention to some details
when using this equipment.
High and low temperature test chamber is a test equipment for plastics, rubber, metals, electronics and other materials*, which is mainly used to detect changes in the performance of materials under various environmental conditions and to test the heat resistance, cold resistance and other properties
of various materials.
Reasons for abnormal start of the high and low temperature test chamber: Caused by unclean: The bottom of the ground around the high and low temperature test chamber should be kept clean to avoid causing a large amount of dust to be sucked into the unit, resulting in equipment failure and reducing the performance of
the equipment.
Errors in internal maintenance: The test chamber should remove the impurities inside before the test, the cleaning work of the studio should be at least once a year, and the vacuum cleaner should be used to remove
the dust in the room.
When the high and low temperature test chamber opens and closes the door or when taking the sample, the test sample and the door seal cannot be in contact to prevent the seal from being damaged
.
The test sample must be turned off during the test, and the staff must bring dry, anti-electricity and high-temperature gloves to take and place the test sample
.
The refrigeration system as the core part of the high and low temperature test chamber * first check all the copper pipes have no leakage, various functional heads and welding ports if the oil leakage is found to be immediately solved
.