echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Seven common problems of waterproof coating construction

    Seven common problems of waterproof coating construction

    • Last Update: 2021-08-25
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com



    Resolution:


    Specific phenomenon: the coating does not stick to the base layer or blisters or insufficient adhesion

    Prevention:

    1.


    2.


    3.


    4.


    5.


    2.


    Specific phenomenon: after the coating is formed into a film, the thickness is uneven

    Prevention:

    1.


    2.


    3.


    Three, pimple

    Specific phenomenon: there are lumps in the coating, and after the coating film is applied, the coating film contains small particles

    Prevention:

    1.


    2.


    3.


    4.


      Four, paint layering

      Specific phenomenon: After the coating film is formed into a film, the coating film is delamination, or there is blistering between the coating films

      Prevention:

      1.
    In the process of dividing and forming the film, the cleaning is not in place before each construction

      2.
    The waterproof membrane is not completely dry in the previous time

      Five, the drying speed is slow

      Specific reason: because the single-component acrylic paint is formed into a film through the volatilization of water, high humidity and low temperature environment hinder the water in the paint

    Volatile, so the drying speed is relatively slow

      Prevention:

      1.
    Strengthening indoor ventilation conditions can be more conducive to the use of water

      2.
    The method of thin coating and multilateral coating is more conducive to the volatilization of water.
    During construction, you must wait until the coating film is dry each time.

    Paint next time

      3.
    Use cement-based paint for construction, or use other waterproof paint

      6.
    After the waterproof construction is completed, the coating film is cracked

      specific reason:

      1.
    The grassroots is not cleaned and there is a lot of floating soil

      2.
    If the coating is too thick at one time, the coating film will be cracked due to uneven moisture volatilization during the drying process of the coating film.

      3.
    When construction is carried out outdoors, there are strong winds and other weather in the external conditions, which may easily lead to cracking

      Prevention:

      1.
    Remove the floating soil from the base layer before construction, and treat the base layer with a paint primer, and take the method of multiple times of thin coating

      2.
    Avoid outdoor construction in windy weather

      Seven, the phenomenon of tofu residue caused by waterproof coating

      The specific reason: the amount of water added to the paint is too large, which leads to the separation of the liquid material and the powder material of the paint, and the powder material sinks, like tofu

      Prevention measures: Control the amount of water added, and perform the proportioning strictly according to the product instructions.
    (Source: Global Coatings Network) (For more information, please log in: Global Coatings Network http:// )

    http:// 

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Related Articles

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.