echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Senior decorater teaches you the key points of wall construction supervision

    Senior decorater teaches you the key points of wall construction supervision

    • Last Update: 2021-03-10
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    China Paint Network
    News: China
    Coatings Network
    News: Grass-roots construction is the basis of all construction, do a good job of grass-roots construction, so that the process of the future more smooth, so that the renovated wall more durable and beautiful. As the owner of you, do you know half-knowing about grass-roots construction? Let's take a look at it.
    1, slotting precautions
    when the transformation of added water pipe wire, in the wall slot can not be thrown, to throw vertically, because the damage to the wall is greater, the earthquake resistance, strength has a lot of damage, can only be thrown vertically, the length of the throw can not exceed 3-5 centions. If the groove is deep, it is easy to touch the rebar in the wall and saw it off. If the groove is shallow, it will be easy to drum bags in the future.
    2, material inspection
    first of all, pay attention to whether the foreman has the act of stealing beams for columns, or the company provided materials hand in hand with sheep, and then with another purchase of materials to fill the gap, once there is a problem, repair after-sales will be involved. In addition, material classification to avoid pollution, formal decoration companies will generally be the project schedule and supporting tools placed in a prominent position, decoration site is also relatively clean. Renovation materials to be classified and placed, easy to pollute each other to be placed separately.
    3, anti-crack inspection
    wall works will often run through the entire process of decoration and construction, if there is wood or shape of the wall, in the early stage of construction will enter. And if it's
    paint
    paint, it's going to start in the middle and late stages. But for the construction of the wall, paint painting often has to go through scraping putty, polishing, brushing paint, primer and other multi-process, if not strictly in accordance with the construction specifications to carry out, if the painting is not in place, or did not wait until the previous process dry on the next process, it is easy to appear wall cracks, cracks and other phenomena.
    small trick: material placement can not change the physical properties of the material, can not cause mutual contamination of the material, can not cause the deformation of the material, can not cause safety hazards, but also can not cause packaging damage. For example, tiles can not be placed on sand, cement,
    open
    , paint barrels can not be placed on the plate.
    wall paint supervisor bright appearance brush out
    wall decoration is facade decoration, it can use dust, whitewash, painting, decoration, decoration, screen hanging and other methods for decorative construction. Especially for the wall paint supervisor, the owner should be more cautious, mainly from the following four aspects.
    1, check the foundation project construction
    wall works will often run through the entire process of decoration and construction, if there is wood or modeling of the wall, in the early stage of construction will enter. And if it's just paint, it starts in the middle and late stages. But for the construction of the wall, paint painting often has to go through scraping putty, polishing, brushing paint, primer and other multi-process, if not strictly in accordance with the construction specifications to carry out, if the painting is not in place, or did not wait until the previous one.
    2, material inspection
    wall paint involves the whole house, so the quality of paint is affecting the entire home environment and human health. Such as:
    latex paint
    , do not choose too poor quality, because it is easy to cause uneven color and other decoration problems. Latex paint to be used with water, so the concentration should be moderate, too thick too light is not suitable.
    3, brushing process inspection
    brushing process inspection is also related to the quality of wall paint, such as: scraping putty at least 3 times, and each time the putty can not scrape too thick, each time have to wait completely dry before scraping again. If you don't start brushing latex paint completely, it's easy to crack the walls later. After scraping the putty, the wall needs to be leveled with sandpaper. If the wall is not flat enough, then the latex paint brushed out will appear a deep piece of shallow piece of the situation, very unsealable. And brush latex paint when the big face to roll with a rolling brush, corner corner to brush with a brush, but also at least 3 times, each time to wait for a complete dry after brushing again.
    : Safety and quality issues are inextricable at all times. Renovation, is also a can not be less. Carefully check to eliminate safety hazards into the site, if found to have safety hazards, to timely inform the responsible foreman, and inform the decoration company to ensure that the construction site does not appear any safety issues.
    tile-laying supervisor posted the perfect wall
    many people like to run to the construction site every day when renovating, but after all, we are not professionals, there is no experience, do not know what to see. In fact, the decoration site can directly reflect the quality of construction, especially the details of the quality of decoration can be reflected in the site, carefully look at these links can not only test the quality of construction workers, but also timely find problems in the decoration, prevention. Here's a look at the tricks of the decoration supervisor.
    1, wall processing inspection
    brick first to carry out wall treatment, wall treatment mainly includes: First, brick should be cleaned before the grass. , be sure to clean up the decorations on the wall, or dirt on the ground, otherwise the cement mortar and the grass can not stick. In addition, if the wall itself has cracks, should be properly handled before the tile, the second wall tile has a high moisture content, the tile front grass should be fully watered and moist, tiles should also be soaked in water for at least 20 minutes before use. Finally, when the brick must be required to pull the line, and supplemented by a horizontal ruler to control the quality.
    2, material
    check that the practical tiles and the list are consistent, and check that the construction staff to the tile treatment is correct. The correct treatment method is: 1. Stacked in a dry and ventilated place away from open flames; 2. The tiles must be fully soaked before practical use.
    3, construction materials and material handling inspection
    in order to reduce the loss of tiles, we must grasp the whole process link. As far as tiles are concerned, it is best for consumers to purchase qualified products and agree with merchants on replacement conditions, such as whether they can be replenished, returned, replaced, claim conditions and liability, and know how to handle them in the event of a problem; In order to avoid the loss of tiles, you have to work in supervision. "Once you find that a worker has cut the tiles aside or broken them, they have to ask to prevent them from wasting them at will."
    4, construction quality supervision
    many owners in the decoration process, will be worried about whether the decoration works smoothly, decoration company's construction quality is guaranteed, will always unconsciously run to the decoration site to supervisor, but if you do not know how to carry out supervision, then even to the scene, there is a problem, you will not see. The following small editor will solve for you two points of personal supervision: First, to observe the decoration and construction team's responsibility and self-confidence. Second, observe the decoration company's on-site management capabilities.
    small tips: If the wall is a rough cement wall, directly after the wall is pulled, you can paste the tiles, if the wall has been leveled treatment, before the tile must be shoveled off the wall, exposing the cement base, and then with cement to pull the wall, and then the tile, in order to increase the cement mortar and wall mounting, to prevent falling off.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.