Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
In order to ensure the reliable and normal operation of the high and low temperature test chiller of Wuxi Guanya Semiconductor, and to prevent the failure of the chiller of the semiconductor high and low temperature test chiller due to improper construction of the water distribution pipeline, some installation tips should be paid attention to when installing this unit
.
1.
When installing the semiconductor high and low temperature test chiller, be careful not to damage the unit, and reasonably arrange the space around the semiconductor high and low temperature test chiller to facilitate the maintenance of the semiconductor high and low temperature test chiller
.
2.
According to the requirements of piping system design, construction and installation, reasonably design and install the chilled water and cooling water system to give full play to the chiller performance of the semiconductor high and low temperature test chiller
.
3.
The refrigeration unit of the semiconductor high and low temperature test chiller should be placed horizontally and installed in a ventilated position
.
4.
For the installation and construction of the unit piping, please refer to the piping method recommended by Wuxi Guanya Semiconductor High and Low Temperature Test Chiller
.
5.
When the surrounding environment of the water source cooling tower is harsh, Y-type filters should be installed in the chilled water and cooling water circuits and cleaned regularly
.
The upper part of the closed chilled water system should be installed with an automatic exhaust valve, and the lower part of the system should be installed with a drain joint for system drainage
.
6.
After the chilled water pipeline system passes the tightness test, cover it with an insulating layer to avoid loss of cooling capacity and dripping water in the pipeline
.
7.
The installation of the semiconductor high and low temperature test chiller should be carried out in accordance with the instructions to avoid corresponding failures caused by improper installation
.
.
1.
When installing the semiconductor high and low temperature test chiller, be careful not to damage the unit, and reasonably arrange the space around the semiconductor high and low temperature test chiller to facilitate the maintenance of the semiconductor high and low temperature test chiller
.
2.
According to the requirements of piping system design, construction and installation, reasonably design and install the chilled water and cooling water system to give full play to the chiller performance of the semiconductor high and low temperature test chiller
.
3.
The refrigeration unit of the semiconductor high and low temperature test chiller should be placed horizontally and installed in a ventilated position
.
4.
For the installation and construction of the unit piping, please refer to the piping method recommended by Wuxi Guanya Semiconductor High and Low Temperature Test Chiller
.
5.
When the surrounding environment of the water source cooling tower is harsh, Y-type filters should be installed in the chilled water and cooling water circuits and cleaned regularly
.
The upper part of the closed chilled water system should be installed with an automatic exhaust valve, and the lower part of the system should be installed with a drain joint for system drainage
.
6.
After the chilled water pipeline system passes the tightness test, cover it with an insulating layer to avoid loss of cooling capacity and dripping water in the pipeline
.
7.
The installation of the semiconductor high and low temperature test chiller should be carried out in accordance with the instructions to avoid corresponding failures caused by improper installation
.