-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The programmable constant temperature and humidity test chamber simulates various environmental states and tests the performance
of various products and raw materials with heat resistance, moisture resistance, dry resistance and low temperature resistance.
Suitable for paper, printing, electronics, electrical appliances, metals and other industries
.
1.
The constant temperature and humidity test chamber must be grounded when the box shell is installed, and the ungrounded may cause the risk of electric shock once the leakage of
electricity.
2.
Do not rush to run the equipment, make sure that the installation is reliable before running the equipment
.
3.
If the test sample of the studio is to be tested with electricity, the connected power supply is an applied electric source, do not connect
directly from the test chamber.
4.
Do not move the machine when the machine has stored the test sample in the running or working room to avoid the sample reversal or drop
.
5.
Check whether the castors are fixed after the machine is placed, that is, the castors are off the ground to adjust the foot to the ground, otherwise the machine may be forced to move
when affected by external forces.
6.
The installation of the constant temperature and humidity test chamber is required to be in a horizontal state, otherwise it will cause alarms or unstable
humidity control.
7.
In the operation process, unless it is necessary, do not open the box door, otherwise it may cause high temperature air flow to rush out of the box, causing burns, if it must be opened, relevant protective measures
should be done.
8.
When plugging in and unplugging the communication interface cable between the test chamber and the computer, you must first turn off the computer power supply, and do not allow live plugging and unplugging, because this may damage the communication module
of the controller or computer.
9.
Do not open the box door immediately after the test is over, pay attention to the temperature inside the box to avoid burns or frostbite
.
10.
The constant temperature and humidity test chamber is prohibited from putting inflammable and explosive dangerous goods for testing
.