-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
We learned from the Industrial Development Department of the Zhaoshan Demonstration Zone that a historic pesticide residue on the side of Zhaoyun Road in the district has been removed and transported
.
Two years ago, when Zhaoshan Road was built, the pesticide residues that had been buried for half a century in the original Nantian Pesticide Factory were unintentionally excavated and transferred to the side of Zhaoyun Road for temporary disposal
.
A few days ago, Zhaoshan Demonstration Zone decided to clean up the waste residue and carry out harmless disposal
.
After a public bidding by the Environmental Protection Foreign Cooperation Center of the Ministry of Environmental Protection and financial support from the United Nations Industrial Development Organization, it was finally determined that the project will be constructed by Hebei Jinyu Mangrove Environmental Technology Co.
, Ltd.
to clean up the waste in the pesticide waste landfill area.
, Packaging, transport the packaged waste to the company for disposal, and finally complete the waste residue treatment there
.
It is understood that the landfill area is about 200 square meters, and the waste mainly contains 666 pesticide residues and contaminated soil, totaling about 600 cubic meters, and the total amount of waste that should be disposed of is about 1,020 tons
.
Before construction, the Zhaoshan Demonstration Zone commissioned Hunan Jingyi Environmental Protection Inspection Co.
, Ltd.
to conduct an environmental impact survey on the landfill area.
The monitoring report issued shows that the monitoring results of lead, arsenic, and BHC in surface water, groundwater and soil in the area All meet the corresponding standard limit requirements, and cause no pollution to the surroundings
.
Zhaoshan Demonstration Zone requires that sidewalks and road facilities must be protected during clearing and transportation, and the road surface must not be polluted
.
The construction unit overcame all difficulties and went all out to complete the clearing and transportation work, and solved the "heart disease" of the surrounding people
.
After entrusting a third-party qualified testing agency to conduct on-site testing, the landfill area is being backfilled
.
During the entire construction process, the atmospheric monitoring vehicle of the Municipal Environmental Protection Bureau also went to the scene to monitor every day
.
.
Two years ago, when Zhaoshan Road was built, the pesticide residues that had been buried for half a century in the original Nantian Pesticide Factory were unintentionally excavated and transferred to the side of Zhaoyun Road for temporary disposal
.
A few days ago, Zhaoshan Demonstration Zone decided to clean up the waste residue and carry out harmless disposal
.
After a public bidding by the Environmental Protection Foreign Cooperation Center of the Ministry of Environmental Protection and financial support from the United Nations Industrial Development Organization, it was finally determined that the project will be constructed by Hebei Jinyu Mangrove Environmental Technology Co.
, Ltd.
to clean up the waste in the pesticide waste landfill area.
, Packaging, transport the packaged waste to the company for disposal, and finally complete the waste residue treatment there
.
It is understood that the landfill area is about 200 square meters, and the waste mainly contains 666 pesticide residues and contaminated soil, totaling about 600 cubic meters, and the total amount of waste that should be disposed of is about 1,020 tons
.
Before construction, the Zhaoshan Demonstration Zone commissioned Hunan Jingyi Environmental Protection Inspection Co.
, Ltd.
to conduct an environmental impact survey on the landfill area.
The monitoring report issued shows that the monitoring results of lead, arsenic, and BHC in surface water, groundwater and soil in the area All meet the corresponding standard limit requirements, and cause no pollution to the surroundings
.
Zhaoshan Demonstration Zone requires that sidewalks and road facilities must be protected during clearing and transportation, and the road surface must not be polluted
.
The construction unit overcame all difficulties and went all out to complete the clearing and transportation work, and solved the "heart disease" of the surrounding people
.
After entrusting a third-party qualified testing agency to conduct on-site testing, the landfill area is being backfilled
.
During the entire construction process, the atmospheric monitoring vehicle of the Municipal Environmental Protection Bureau also went to the scene to monitor every day
.