-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
First turn on the power, then turn on the power, the power light is on; it means that the controller will automatically enter the fixed value stop interface;After turning on the power, when the control program set by the machine is completed, the machine will stop running;When When the set control program is completed, the machine will stop running;Open the door handle of the equipment, put the test sample on the sample rack, and then close the door of the box;According to the operation manual, first perform the test setting operation, and then Enter the test state according to the set operation mode;During the test, if you want to observe the change of the inner box, you can turn on the door light switch, and you can realize the inner change through the opened window; the temperature and humidity in the controller test box will be displayed Change (if there is no humidity test, the humidity value is not displayed);Open the door handle of the device, take out the test sample of the sample, and check the sample after the tes.
And record the test condition.
The test is completed;After the test, turn off the power switc.
The second rain test box precautionsIf you hear an unexpected sound during operation, you need to stop the inspection, and restart after finding the exclusion, so as not to affect the service life of the equipmen.
The actuator must be lubricated regularly, and the reducer must be cleaned with 20 # oi.
After the equipment is positioned, it is supported by the bracket to prevent the casters from being displaced after being vibrated during the equipment tes.
The rain test box has been running for a long tim.
If the pores are found to be blocked, the pipeline must be removed, and it can be washed with clean water after assembl.
And record the test condition.
The test is completed;After the test, turn off the power switc.
The second rain test box precautionsIf you hear an unexpected sound during operation, you need to stop the inspection, and restart after finding the exclusion, so as not to affect the service life of the equipmen.
The actuator must be lubricated regularly, and the reducer must be cleaned with 20 # oi.
After the equipment is positioned, it is supported by the bracket to prevent the casters from being displaced after being vibrated during the equipment tes.
The rain test box has been running for a long tim.
If the pores are found to be blocked, the pipeline must be removed, and it can be washed with clean water after assembl.