    Preparations for the use of the reactor high and low temperature cold and heat cycle machine

    • Last Update: 2022-06-19
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    The reactor high and low temperature cold and heat cycle machine is to guide the heat medium to circulate in a closed circulation system to heat or cool the required objects.
    It is mainly used for supporting glass reactors, rotary evaporators, fermentation tanks, Calorimeter, etc.
    So, what should you pay attention to before using it? 1.
    The placement position of the high and low temperature cooling and heating cycle machine of the reactor The models of the integrated refrigeration and heating cycle machine are large and small, so the laboratory needs to reserve the corresponding position according to the appearance of the high and low temperature cooling and heating cycle machine of the reactor.
    It is recommended to place it on a stable ground without too much slope.
    There are wheels under the equipment that can be moved.
    If the moving work is over, the wheels of the integrated laboratory refrigeration and heating cycle machine can be fixed
    .

    2.
    Corresponding aisles or spaces are reserved around the reactor equipment for high and low temperature cold and heat cyclers, and the ground is clean and non-slip, so that equipment operators can add liquid or perform other operations
    .

    3.
    The Wuxi Guanya Refrigeration and Heating Cycle Integrated Machine is not suitable to be placed outdoors.
    Although the equipment is fully enclosed, the appearance and performance of the equipment will be damaged by wind, rain and sun exposure.
    It is recommended to install it in an environment with suitable indoor temperature for cooling and heating.
    The integrated cycle machine needs to be kept away from dangerous objects and liquids
    .

    4.
    The temperature environment of the integrated refrigeration and heating cycle machine requires room temperature.
    The temperature should not be too low, and it is not suitable for high temperature and high humidity.
    It is recommended to leave a gap of more than 30 cm around the device
    .

    5.
    The equipment power supply, refrigeration and heating cycle integrated machine shall be wired according to the manual, pay attention to the power wiring of each electrical part, refer to the power size of the power supply in the instruction manual, and select the appropriate wiring connection
    .

    6.
    After the high and low temperature cooling and heating cycle machine equipment of the reactor is connected and energized, it cannot be disassembled without permission, otherwise it will cause the corresponding equipment operation failure, and in severe cases, equipment damage to the refrigeration and heating cycle integrated machine will occur
    .

      4.
    Equipment debugging The refrigeration and heating cycle integrated machine needs to be debugged before running in the laboratory.
    This requires operators who know the performance of the equipment to debug.

    .

      5.
    The commissioning personnel of the integrated refrigeration and heating cycle machine must first check whether the configuration of the equipment and whether the installation, foundation, and pipeline connections meet the requirements
    .

    6.
    Check whether the power connection is reasonable, and test the pipeline after power on to see if it meets the experimental requirements
    .


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.