-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Matters needing attention in the installation of the ampoule wire drawing and filling machine: 1.
When the machine is installed and wired, the machine should be cleaned with kerosene first
.
2.
Check the machine to see if there is any damage, looseness or rust during the shipping process
.
3.
Add new lubricating oil to each lubricating point
.
4.
Rotate the machine several times with the crank handle to check whether the machine is flexible and whether the movement and coordination are correct
.
5.
About the connection method of the circuit system, perfusion system and gas system
.
After the circuit is connected, please check whether the motor is reversed.
To do this, you must first disconnect the belt between the side-connected motor and the main shaft, and then open the switch to check whether the belt pulley of the motor rotates clockwise
.
Only put on the belt to drive
.
Whether the rotation of the motor faces the motor output shaft is clockwise
.
6.
According to the timing action of the machine, check the working condition of each component, and only after it is judged that the action is normal can it be put into production
.
7.
Note: If there is no ampoule when the car is empty, the power switch K2 of the electromagnet must be disconnected, otherwise the electromagnet coil will be burned
.
Operation requirements: Before starting the machine, firstly adjust the force gauge of the 8 voltage stabilizer to 0.
3kg/cm², and require the 9 places to discharge oil frequently, so as not to reduce the flame temperature and affect the qualified rate of wire drawing
.