echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Active Ingredient News > Drugs Articles > Operating Instructions of Explosion-Proof Refrigeration Heating Cycle Integrated Machine

    Operating Instructions of Explosion-Proof Refrigeration Heating Cycle Integrated Machine

    • Last Update: 2022-06-20
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com

    Explosion-proof refrigeration and heating cycle integrated machine is a temperature control device suitable for connecting reactors for refrigeration and heating reactions in pharmaceutical, chemical, laboratory and other industries.
    It is used in different reactors and reactors.
    It is also reliable to a certain extent
    .


    So when users operate the explosion-proof refrigeration and heating cycle integrated machine, they need to avoid some misunderstandings as much as possible, so as not to cause the equipment to be inoperable
    .

    1.
    When the explosion-proof refrigeration and heating integrated machine is running, the material runs and reacts in the reaction kettle, and can control the evaporation and reflux of the reaction solution.
    After the reaction is completed, the material can be discharged from the discharge port at the bottom of the kettle, which is easy to operate
    .

    2.
    The power supply voltage must be consistent with that specified by the instrument.
    No-load operation is not suitable for high-speed operation.
    The life of the electrical box is greatly affected by the surrounding temperature and humidity
    .

    Please keep the governor and motor dry
    .

      3.
    Install the machine first, and then wire it by a professional electrician and turn it on
    .

    The ground terminal must be grounded, and within 5 minutes of cutting off the power supply, there may still be electric shock due to the discharge of the inverter or capacitor
    .

      4.
    Pay attention to the impact damage caused by the hard objects on the body to the equipment body, and pay attention to the impact damage caused by the hard objects on the body during operation
    .

      5.
    Pay attention to the high temperature cycle, the circulating pump should be turned on first, and the heat transfer fluid will slowly heat up under the condition that the heat transfer fluid runs and circulates
    .

      When using it, you need to pay attention to the use of explosion-proof refrigeration and heating cycle integrated machines, try to choose brand manufacturers, and do explosion-proof measures
    .


    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.