-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Small refrigeration and heating circulators are equipment widely used in petroleum, chemical, pharmaceutical and other technological processes.
It is very important to install and use small refrigeration and heating circulators correctly
.
1.
It should be placed indoors
.
When equipping multiple devices, they should be placed separately
.
There should be an outlet directly leading to the outdoor or channel, and the equipment location should be well ventilated
.
2.
During installation, the sealing surfaces should be prevented from bumping against each other
.
Place it in a fixed position.
When tightening the main nut, gradually tighten it diagonally and symmetrically
.
The force should be uniform, and the equipment should not be tilted to one side to achieve a good sealing effect
.
3.
All nut thread joints should be lubricated when they are assembled
.
4.
The needle-type valve is sealed by the line.
It only needs to gently turn the valve needle and press the cover tightly to achieve a good sealing effect
.
5.
Move the rotating body on the kettle by hand to check whether the operation is flexible
.
6.
The controller should be placed flat on the operating table, and the surrounding medium does not contain conductive dust and corrosive gases
.
7.
Check whether the movable parts and fixed contacts on the front panel and the rear panel are normal, open the upper cover, check whether the contact of the connector is loose, and whether there is damage or corrosion caused by poor transportation and storage
.
8.
The controller should be grounded reliably
.
Connect all wires, including the power wire, the electric furnace wire between the controller and the kettle, the motor wire, and the temperature sensor and tachometer wires
.
9.
Turn on the "power" air main switch on the panel, and the digital display should display
.
10.
Set various parameters (such as upper limit alarm temperature, working temperature, etc.
) on the digital display meter, then press the "heating" switch, and the indicator light on the "heating" switch is on at the same time
.
Adjust the "voltage adjustment" knob to adjust the heating power
.
11.
After each operation, the residue should be removed
.
The main seal should be cleaned frequently and kept clean, and it is not allowed to wipe with hard objects or rough surfaces
.