-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Network
News: "Black Heart excellent work cut back my hard-earned money", "excellent, Sanbao joint fraud owners", into Qingdao Shuangyuan Road, the excellent Azure Islands community, such banners everywhere. The reason is that the owner bought a new house out of the question, the wall touched, the mortar fell down. Now even decoration can not be carried out, watching the new house there but can not live in. Many owners gathered in front of the sales office, their idea is the same: that is, check out.
Qingdao excellent Azure Islands more than a hundred houses on the wall on the touch of
then, how does such a house pass the acceptance? The owners contacted the quality control station, excellent Azure Islands and other people, did not see the housing acceptance certificate.
the walls of the new house fell down with mortar
Yesterday, dozens of owners gathered in front of Qingdao Premier Azure Islands Property Company. Some are dedicated leave to rush over, is to want to return the community's house as soon as possible.
the new house, which I just handed in at the end of March, should I return it? Reporters came to the excellent Blue Islands Phase III P5 building unit 4 Mr. Liu's home, pushed open the door, he stepped to the wall, "you look at this wall, you look at the wall." With his hand, Mr. Liu removed the white ash from the wall, touched it with his hand, and the cement mortar fell down. Such a house is to fool people, how to live, decoration after what if there is a problem how to do, we do not want to toss back and forth. "Mr. Liu said, I didn't know anything at the time, I wanted to move into a new house, and I didn't expect this to happen. He bought a house here based on his knowledge of the brand of excellence." I knew this was the case, and I wouldn't have bought a house here. Mr. Liu said.
Liu's house area of about 88 square meters, almost all of the walls are such a situation, the kitchen is more obvious, the outside corner of the wall can move with his hands. The reporter tried to touch the wall with his hand, very soft, there is basically no cement inside.
many on-site owners told the letter network, because of the hurry to live in new housing, many people did not see the housing acceptance certificate on the developer for the delivery of housing procedures.
Nations can not be renovated at present
reporters walked into the excellent Azure Islands community, many floors are hung banners, "Black Heart excellent work cut back my hard-earned money", "excellent, Sanbao joint fraud owners", the owners of the housing quality of dissatisfaction.
Recoal reporter was informed that the excellent Azure Islands District phase three a total of 579 households, "almost all the owners have encountered such a problem, we jointly signed check-out of the owner is more than 200 households," said one owner, who did not want to be named, he was paid in July 2013, waited a year and a half to get the house, waiting to hand over the house hastened decoration and renovation, now because of the wall problems caused by decoration can not be carried out.
"Excellence, what's wrong with this?" We buy a house is to run to him is the real estate industry's big brand to buy, this can afford to trust us?" The owner looked at his room and muttered to himself.
Engaged in many years of decoration business Yang Dongping after watching the video provided by reporters said: the wall like sand fell like a slur is a problem with the cement label, mainly inside the cement add less, and too much sand caused by hanging, if such a wall scrape putty, then it will burst, simply can not stick together.
Owners found that the new wall was privately demolished
Mr. Dong received the house at the end of March, has not come to see the house, yesterday, Mr. Dong first came to his new house, a door, Mr. Dong on the door. It turned out that the inner walls of Mr. Dong's house had been shoveled off. "I've already closed the house, and without my permission, they've come into my house and shoveled the walls off!"
So who went into Mr. Dong's house and smashed it? Originally, although Mr. Dong received the house, but in the property still has a decoration key. "It was the property that gave the keys to the construction unit, and the construction unit entered my house." Mr. Dong said.
reporters in Mr. Dong's house also saw that the wall was shoveled into potholes, scattered around the wall shoveled cement blocks, construction tools are also stacked on the scene.
Xiong, a staff member at the construction unit, explained: "We got the keys from the property and wanted to pick out a few model houses for maintenance. It is true that we have not done enough to neglect our communication with Mr TUNG, which has led to a misunderstanding. Mr
Xiong also said that the walls of Mr. Dong's house would be dealt with as soon as possible.
The walls of Qingdao's excellent Azure Islands owner's home
City Yang Quality Supervision Station requires excellent comprehensive maintenance
then, the excellent Azure Islands community housing is qualified? Is there a certificate of acceptance of the house?
Reporters in a residential project quality sub-family acceptance record table to see that the acceptance project includes the wall of this content, written "no wall ash phenomenon", acceptance conclusions are in line with the requirements. At the bottom of this form is the official seal of construction unit Excellent Real Estate Group (Qingdao) Co., Ltd. Engineering and Technology Department, supervision unit Shandong Qingang Engineering Construction Supervision Co., Ltd., construction unit Qingdao Wangcheng Sanbao Construction Co., Ltd.
In response to this matter, the owner, Mr. Li dialed the city Yang District Quality Supervision Station phone, a female staff member answered the phone, after learning that Mr. Li to consult, and then transferred the phone to another male staff member. The staff member said:
This matter has been implemented clearly, is now being dealt with, because the number of owners reflecting the problem is more, so the construction side decided to find several households as a maintenance model, if the owner is satisfied with the maintenance of the model, in accordance with the model to repair." We require excellence to be fully repaired unconditionally. "
as to why the acceptance is qualified, there will be such problems, " the staff member said: "When there is a problem on the repair." Specific reasons for the construction units and construction units have now been verified, there may be a batch of premixed mortar in the ratio of the problem. "
outstanding aspects have not been the person in charge
after contact with the City Yang Quality Supervision Station, the owner Mr. Li came to the excellent Azure Islands sales office to ask to see the housing acceptance certificate.
t know about this," said a customer service agent with the number 029. "At the repeated request of the owner, the customer service officer brought in a customer service inspector number 001.
the customer service inspector, number 001, learned of the problem of sand falling off the wall, and found a staff member surnamed Kong, but the staff member also said that it was not clear. "I was off work yesterday, and I don't know about it, " he said. "
other owners also brought a staff member named Su Donghui contact information, according to the owner, the excellent side promised to take the housing acceptance certificate to the owner on the afternoon of 8 to view, and Su Donghui is the staff to handle the matter. However, the owner repeatedly called Su Donghui's phone, no one answered.
, the owner contacted Wang Wenyong, the owner of the excellent Azure Islands development (construction) unit, whose phone was not answered. In the end, the owners didn't see the people responsible for the excellence.
Tsingtao City Quality Supervision Station: coordination can not be prosecuted
Yesterday afternoon, the reporter consulted Qingdao Quality Supervision Station on this matter, staff Mr. Wang said: "Excellent Blue Islands problem, today many people call reflected." Mr
Wang said: "Housing acceptance certificate is after the construction, survey, design, supervision, construction units after five parties to accept the acceptance of the certificate signed." It is used for filing in the government approval hall and is not open to owners. Of course, it is the responsibility of the developer to explain to the owner that the housing acceptance is qualified. Mr
Wang expressed his suggestion for a solution to the matter. He said: "First of all, we must contact the local quality control station, so that the local quality supervision station to coordinate, but do not rule out the local quality control station can not coordinate the possibility of developers." If the quality control station can not coordinate, it is recommended that the owners as soon as possible through legal proceedings to safeguard their legitimate rights and interests. ”