    Instructions for operating the reactor control system

    • Last Update: 2022-09-21
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    Reactor control system is a good temperature control product, the user in the choice, need to understand it clearly better
    .

    1.
    Before use, this product should be operated in accordance with the rules and regulations
    .

    Before operation, it should be carefully checked for abnormalities, and in normal operation, the terminals on the upper cover and the contact plate should not be opened to avoid electric shock; Pressure operation is strictly prohibited
    .

    2, the model of the reactor control system is large and small, so in the equipment to the laboratory need to reserve the corresponding position according to the appearance of small and large, it is recommended to place a smooth ground, can not be too steep, there are wheels under the equipment can be moved, if the mobile work is over, the laboratory reactor control system wheels can be fixed
    .

    3.
    There is a corresponding aisle or space around the equipment, and the ground is clean and non-slip, so that the equipment operator can add liquid or carry out other operations
    .

    4, should be in accordance with the instructions for wiring, pay attention to the power wiring of each electrical part, refer to the power supply power of the instruction manual, choose the appropriate wiring connection
    .

    After the equipment is connected to power, it cannot be disassembled privately, otherwise it will lead to the failure of the corresponding equipment operation, and if it is serious, it will lead to equipment damage
    to the reactor control system.

    5.
    Debugging work is required before the laboratory operation, which requires the operator who understands the performance of the equipment for debugging work
    .

    The commissioning personnel need to first check whether the configuration of the equipment and the installation, foundation, pipeline connection, etc.
    meet the requirements
    .

    Check whether the power connection is reasonable, and test the pipeline after power is turned on to see if it meets the experimental requirements
    .

    6.
    After debugging the performance of the equipment, check whether the environmental site of the reactor control system is clean and bright and ventilated
    , check whether the pressure instruments are running normally, and then you can officially run after the inspection.

    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.