Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Installation site selection In order to facilitate operation, the distance between the host and the wall > 800mm, the front should be determined according to the operation process, the left and right sides should be determined according to the fluidized bed installation (see the outline drawing), and the height of the workshop space should be at least 500mm
higher than the main machine.
Equipment needs to be cleaned, especially when changing varieties and deactivation, it is required that the site should be able to drain water, and the ground should be left with a slope of 1/100
.
The device safety hole is set on the top or side of the main unit, and it is best to open this hole to the outdoors, and once an explosion occurs, it will achieve rapid discharge
.
Centrifugal fans and air compressors operate with high noise, so it is best to install them in isolation from the main engine for sound reduction
.
Installation work 1, the main machine installation First determine the suitable position, stand up and support and fix the top cylinder, middle cylinder, bottom cylinder with screws, and then push the material cart to the appropriate position
.
2, compressed air pipeline All pipes have been connected to the corresponding position when they leave the factory, and leave a sufficient length, after unboxing, the control cabinet is first set on the left side of the host, and the trachea is sorted out
as necessary.
Due to the installation of the air compressor in isolation from the main unit, the user directs the pipeline to the corresponding joint
of the control cabinet.
3, electric heating precautions A.
electric heating must start before starting the fan to open the damper B.
before closing the draft fan, you must first turn off the electric heating and let it cool C.
The electric heating should be cleaned regularly from half a month to one month to prevent the adsorption dust from fire
.
4, the installation of the fan fan and the host should be isolated and installed, the user should make the corresponding connection duct, not allowed to use galvanized sheet material and thickness less than 1.
5MM plate, at the same time, the pipeline should not exceed 10M length
.
5, peristaltic pump installation running smoothly, can not have to use bolt positioning, it is recommended that the user choose the appropriate position (the right side of the host or the front right), but should not be too high, it is best to be lower than the adhesive level, in order to facilitate the starting of the adhesive into the
pump.
6, binder barrel barrel users bring their own, the lower part of the set up a material outlet, connected to the pump feed takeover
.
7.
Electrical installation