-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Last week, the Bureau of Natural Resources and Planning of Yantai City issued the "Construction Project Site Selection Opinions" for the Yulong Island Refining and Chemical Integration Project (Phase I) of Shandong Yulong Petrochemical Co.
, Ltd.
, marking the transformation and upgrading of the refining industry in this host area.
The iconic project of the vision is continuing to advance.
"The project intends to use international and domestic advanced and mature technology, in terms of engineering design, construction, production control, operation monitoring, etc.
, it will strictly abide by the requirements of national standards and regulations, and set up accident prevention and control measures and emergency plans, uphold advanced management concepts to ensure device safety Stable operation.
” said the relevant person in charge of Nanshan Group, which is leading the construction of the project.
According to expert analysis, the production capacity of the project is similar to Zhejiang Petrochemical, and the equipment configuration is similar to Hengli Petrochemical.
They all follow the full hydrogenation route, and the added value of the product is high.
According to the analysis of the device structure and the trend of crude oil, the price of crude oil fluctuates in the range of 60-70 US dollars per barrel, and the project is relatively competitive.
It is understood that the promotion of this project has become a major event in Yantai City and even Shandong Province in 2019 to promote the conversion of new and old kinetic energy.
In the context of Shandong reforming project approval procedures and accelerating land supply for key projects, the project approval and land preparation work is in full swing.
At the beginning of this year, the government work report of Yantai City and Shandong Province first proposed the Yulong Island refining and chemical integration project.
During the two sessions of the country, Li Xiangping, chairman of Shandong Refining Energy Group, disclosed that the planned total production capacity of the project reached 40 million tons/year, and the first phase of construction was 20 million tons/year, which will promote the integration of the geo-refining industry in Shandong Province.
25 million tons/year backward production capacity of the enterprise On June 28, Shandong Province announced the fourth batch of chemical parks.
Compared with the previous public list, Shandong Yulong Petrochemical Industrial Park was added.
Different from other parks directly determining the scope of the four areas, the provincial government authorizes the Yantai Municipal Government to determine the area of the starting area and the four areas of the park in accordance with the "Administrative Measures for the Identification of Chemical Parks in Shandong Province".
The Shandong Provincial Party Committee and the Provincial Government attach great importance to the Yulong Island refining and chemical integration project and regard it as a landmark project for the conversion of new and old kinetic energy in the province's petrochemical industry and the promotion of high-quality development.
At the Yulong Island Refining and Chemical Integration Project Work Conference on August 7, Zhou Lianhua, Secretary of the Shandong Provincial Development and Reform Commission, asked leaders at all levels to firmly establish the idea of “one game of chess in the province” and open the “green channel” throughout the process to ensure that the project is completed by the end of the year.
Obtained approval and started construction.
On August 19, the Yantai Municipal Bureau of Ecology and Environment issued the "First Public Announcement of the Environmental Impact Assessment of the Yulong Island Refining and Chemical Integration Project (Phase I)", which disclosed project information in detail.
The project (Phase I) has a construction period of 3 years.
It is planned to build a crude oil processing capacity of 20 million tons/year.
The main configuration is 10 million tons/year atmospheric distillation unit, 10 million tons/year atmospheric and vacuum distillation unit, light hydrocarbon recovery unit, Refining process equipment such as desulfurization and desulfurization equipment, residual oil hydrogenation equipment, ethylene, pyrolysis gasoline hydrogenation, aromatic extraction, butadiene extraction, EVA/LDPE and other chemical process equipment and related supporting facilities.
, Ltd.
, marking the transformation and upgrading of the refining industry in this host area.
The iconic project of the vision is continuing to advance.
"The project intends to use international and domestic advanced and mature technology, in terms of engineering design, construction, production control, operation monitoring, etc.
, it will strictly abide by the requirements of national standards and regulations, and set up accident prevention and control measures and emergency plans, uphold advanced management concepts to ensure device safety Stable operation.
” said the relevant person in charge of Nanshan Group, which is leading the construction of the project.
According to expert analysis, the production capacity of the project is similar to Zhejiang Petrochemical, and the equipment configuration is similar to Hengli Petrochemical.
They all follow the full hydrogenation route, and the added value of the product is high.
According to the analysis of the device structure and the trend of crude oil, the price of crude oil fluctuates in the range of 60-70 US dollars per barrel, and the project is relatively competitive.
It is understood that the promotion of this project has become a major event in Yantai City and even Shandong Province in 2019 to promote the conversion of new and old kinetic energy.
In the context of Shandong reforming project approval procedures and accelerating land supply for key projects, the project approval and land preparation work is in full swing.
At the beginning of this year, the government work report of Yantai City and Shandong Province first proposed the Yulong Island refining and chemical integration project.
During the two sessions of the country, Li Xiangping, chairman of Shandong Refining Energy Group, disclosed that the planned total production capacity of the project reached 40 million tons/year, and the first phase of construction was 20 million tons/year, which will promote the integration of the geo-refining industry in Shandong Province.
25 million tons/year backward production capacity of the enterprise On June 28, Shandong Province announced the fourth batch of chemical parks.
Compared with the previous public list, Shandong Yulong Petrochemical Industrial Park was added.
Different from other parks directly determining the scope of the four areas, the provincial government authorizes the Yantai Municipal Government to determine the area of the starting area and the four areas of the park in accordance with the "Administrative Measures for the Identification of Chemical Parks in Shandong Province".
The Shandong Provincial Party Committee and the Provincial Government attach great importance to the Yulong Island refining and chemical integration project and regard it as a landmark project for the conversion of new and old kinetic energy in the province's petrochemical industry and the promotion of high-quality development.
At the Yulong Island Refining and Chemical Integration Project Work Conference on August 7, Zhou Lianhua, Secretary of the Shandong Provincial Development and Reform Commission, asked leaders at all levels to firmly establish the idea of “one game of chess in the province” and open the “green channel” throughout the process to ensure that the project is completed by the end of the year.
Obtained approval and started construction.
On August 19, the Yantai Municipal Bureau of Ecology and Environment issued the "First Public Announcement of the Environmental Impact Assessment of the Yulong Island Refining and Chemical Integration Project (Phase I)", which disclosed project information in detail.
The project (Phase I) has a construction period of 3 years.
It is planned to build a crude oil processing capacity of 20 million tons/year.
The main configuration is 10 million tons/year atmospheric distillation unit, 10 million tons/year atmospheric and vacuum distillation unit, light hydrocarbon recovery unit, Refining process equipment such as desulfurization and desulfurization equipment, residual oil hydrogenation equipment, ethylene, pyrolysis gasoline hydrogenation, aromatic extraction, butadiene extraction, EVA/LDPE and other chemical process equipment and related supporting facilities.