echemi logo
Product
  • Product
  • Supplier
  • Inquiry
    Home > Coatings News > Paints and Coatings Market > Yankuang Group's Inner Mongolia Rongxin Chemical's 400,000-ton coal-to-ethylene glycol project was successfully commissioned

    Yankuang Group's Inner Mongolia Rongxin Chemical's 400,000-ton coal-to-ethylene glycol project was successfully commissioned

    • Last Update: 2021-04-30
    • Source: Internet
    • Author: User
    Search more information of high quality chemicals, good prices and reliable suppliers, visit www.echemi.com
    At 2:55 a.
    m.
    on December 26, 2019, Yankuang Group's Inner Mongolia Rongxin Chemical Co.
    , Ltd.
    project was successfully commissioned with an annual output of 400,000 tons of coal to ethylene glycol ! As the first coal-to- ethylene glycol project of Yankuang Group , it creates a new miracle for the first drive in this field in the northern winter! This project is also the first coal-to-ethylene glycol project to be put into full production in 2019! Ethylene Glycol Yankuang Group Inner Mongolia Rongxin Chemical Co.
    , Ltd.
    has an annual output of 400,000 tons of coal-to- ethylene glycol and 300,000 tons of ethylene glycol polymethoxy dimethyl ether project, which is Yankuang Group’s acceleration of the construction of national modern coal Another major project implemented by the chemical demonstration base.
    The project focuses on the development of "parking, refinement, and high-endization" of the chemical industry, with a total budget of 7.
    68 billion yuan, and it is planned to be completed and put into operation in 2019.
    Yankuang Group's plan is based on the first phase of the Rongxin Chemical Project.
    Through the second and third phases of large-scale construction, the coal chemical industry chain will be lengthened, and finally a 5 million tons/year coal-to- methanol production capacity and a series of downstream fine chemicals will be formed.
    A coal chemical demonstration base for chemical products, creating a new business card for coal conversion and industrial upgrading.
    The project mainly produces 900,000 tons/year of methanol, and uses indirect methods to produce 400,000 tons/year of coal to ethylene glycol.
    Part of the methanol is used as the raw material for downstream DMMn to produce 300,000 tons/year of DMMn.
    The main construction content of the project includes coal gasification 3 sets of 4000t/d coal water slurry gasifier (single furnace coal input is currently the world's largest gasifier), purification (CO conversion, low-temperature methanol washing, CO cryogenic separation, PSA system Hydrogen), sulfur recovery, 900,000 tons/year methanol plant, 400,000 tons/year ethylene glycol plant, 300,000 tons/year DMMn, 2×92000Nm3/h air separation, 2×380t/h high pressure circulating fluidized bed boiler +2×20 MW extraction turbine generator set, public auxiliary equipment and other technological production equipment.
    This article is an English version of an article which is originally in the Chinese language on echemi.com and is provided for information purposes only. This website makes no representation or warranty of any kind, either expressed or implied, as to the accuracy, completeness ownership or reliability of the article or any translations thereof. If you have any concerns or complaints relating to the article, please send an email, providing a detailed description of the concern or complaint, to service@echemi.com. A staff member will contact you within 5 working days. Once verified, infringing content will be removed immediately.

    Contact Us

    The source of this page with content of products and services is from Internet, which doesn't represent ECHEMI's opinion. If you have any queries, please write to service@echemi.com. It will be replied within 5 days.

    Moreover, if you find any instances of plagiarism from the page, please send email to service@echemi.com with relevant evidence.