-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Global Paint Network News: Recently, Henan Provincial Department of Industry and Information Technology, Provincial Development and Reform Commission, Provincial Department of Natural Resources, Provincial Department of Ecology and Environment, Provincial Department of Housing and Urban-Rural Development, Provincial Department of Transportation, and Provincial Emergency Management Department jointly issued the "Henan Province Chemical Park Construction Standards and Identification Management Measures (Trial)" to standardize the construction and identification management
of Henan Chemical Park.
The Measures shall be implemented
as of the date of promulgation.
The Measures mention that in principle, no new chemical parks will be established, and if new ones are really needed, they must be submitted to the provincial government for approval after consultation and approval by the provincial joint meeting; The undertaking of chemical projects included in relevant national or provincial plans shall be approved by the provincial joint meeting, and the chemical park shall be recognized
before the project is put into operation.
In principle, the planned contiguous area of the chemical park is 3 square kilometers or more, and the construction mode of "one district and multiple parks" can be adopted
.
The chemical park shall not be in the direction of the dominant wind and upwind in the main urban area, and the external safety protection distance between it and the protection targets such as urban built-up areas, densely populated areas, and important facilities shall meet the requirements of relevant standards, and the surrounding land planning safety control line
shall be set up.
It is strictly forbidden to select sites
in earthquake faults, geological disaster-prone areas, ecological protection red lines, permanent basic farmland, nature reserves, drinking water source protection areas, and other environmentally sensitive areas.
It is forbidden to build or expand new chemical parks
within the control area of the shoreline of the main tributaries of the Yellow River.
Parks with a total score of 70 points or above in the provincial audit are recognized as chemical parks
.
For parks with a total score of 70 points or less in the provincial review, the rectification period shall not exceed 1 year in principle, and no new chemical projects shall be built, renovated or expanded (except for safety, environmental protection, energy conservation and intelligent transformation projects)
during the rectification period.
After the rectification is completed, it is necessary to reapply for provincial certification
.
In the following circumstances, the park shall not be approved: the establishment of the park and the overall plan have not been approved in accordance with the provisions (the approval of the overall plan before the implementation of these Measures is regarded as the establishment approval), the environmental impact assessment and water resources demonstration of the park planning have not been reviewed and approved, the industrial planning has not been approved, and the park has been identified as having a higher safety risk level or above
.