Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
The salt spray test chamber is integrated into the metal manufacturing of various raw materials, including raw materials, electroplating, analytical chemistry and inorganic compound film, anode treatment, anti-rust oil and other corrosion resistance treatment to test the corrosion resistance
of its goods.
The operation process of the salt spray test chamber is concluded: 1.
Prepare a well-placed site and a separate laboratory
.
The intake manifold, inlet pipe, sewage pipe, etc.
of the machinery and equipment are connected, and the air compressor is
fully prepared.
Installed in an area where
air circulation avoids direct sunlight.
2.
The salt spray test chamber requires staff to operate the process and maintain it
.
3.
The internal spare parts of the machinery and equipment: column sprayer machinery and equipment, sprayer, type pipe, stainless steel rod, V-shaped specimen rack, etc
.
are installed.
Then the pure water and industrial salt are selected in a ratio of 1:21, poured into the salt bucket, and added natural mineral water
to the saturated barrel and its box, the human body, and the airtightness.
4, after preparing to do a good job, the box cover is covered, check some of the difficulties on the pipeline, after clarifying OK, after plugging in the wire, set the shell temperature point, saturation barrel temperature point and experimental time that you must do on the dashboard in the car, according to the experimental requirements of mechanical equipment continuous and cycle two ways
of spraying machine.
After all settings are OK, press Run Only
immediately.
Attached: Some matters that must be paid attention to during the operation of the salt spray test chamber: 1.
Pour the equipped Na2O salt water into the salt water compensation tank, that is, the fully automatic filling of the salt water into the heating tank in the experimental box, so that the salt water flows to the salt water heating tank
.
2.
The inlet position of the automatic water filling stop valve drainage valve, and the power main switch of the automatic exhaust valve will open the isolation stainless steel sink to add water to the position
of the protective layer pad.
3, be sure to first check whether the machinery and equipment are deformed, the pipeline is not smooth acidity test and CASS test common shell raw materials are not the same
.
The raw materials of the standard salt spray test chamber are PVC plates, if you must do CASS test or copper accelerated acetic acid test or other, you must explain before the original, otherwise the improper operation process will deform the housing
.