-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Vial bottle liquid filling production line When the tooth plate is moved to move the bottle to the position of the stopper tooth for filling the liquid medicine, the convex surface of the cam 7 is separated from the swing plate 6, and the swing plate 6 is pulled by the tension spring 4 to swing clockwise and swing.
The plate 6 drives the bottle-pressing bolt 2 to move down until it touches the bottle 3.
At this time, adjust the steel wire rolling head 5 to swing the plate 6 to contact and adjust the adjusting screw 8 so that the ejector bolt 1 extends by about 4 mm.
When an empty bottle appears in the position, the bottle pressing bolt 2 and the rocking plate 6 continue to move down due to the action of the tension spring 4, until the wire rolling head 5 pulls the wire to make the ejector bolt 1 separate from the ejector bar 9, so the applicator cannot be driven to work, and the pouring stops automatically.
liquid medicine
.
The vial liquid filling production line is an automatic machine, so the dimensions of the easy-to-pull bottle, bottle pad and bottle cap are all required to be unified
.
You must first use the crank handle to turn the machine to see if there is any abnormality in its rotation
.
When adjusting the machine, the tools should be used properly, and it is strictly forbidden to use too large tools or excessive force to remove parts to avoid damaging the parts or affecting the performance of the machine
.
Whenever the machine is adjusted, in fact, tighten the loosened screws, and use the crank handle to turn the machine to see if its action meets the requirements
.
Attention when adjusting the lock: After adjustment, each department must pay attention to the locking of each nut.
When using an easy-to-pull bottle in the initial valve test, its average height must be taken.
Irregular easy-to-pull bottles cannot enter the lock to avoid damage to parts
.