-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Rain test chamber is a commonly used test chamber product, suitable for external lighting and signaling devices and automotive lamp shell protection, can provide a realistic simulation of electronic products and components in the transportation and use of various environments
such as water and spray tests.
How should users operate after purchasing rain test chamber products? The following is to introduce the operation specifications of the rain test chamber in detail, hoping to help everyone
.
1.
The equipment checks whether the water tank has sufficient water before running, if there is no first, please fill it with water (clean tap water must be added) so as not to damage the pump; 2.
If you hear an abnormal external sound in operation, please stop for inspection, and then restart the machine after the fault is found, so as not to affect the service life of the equipment; 3.
The equipment runs for a long time, if it is found that the water spray hole is blocked, the pipeline must be removed, rinsed with tap water and then assembled; 4.
The equipment should be kept dry in non-working conditions, and the water after operation should be discharged and the studio and box should be wiped dry; 5.
Avoid dust intrusion into the equipment, after use, put the plastic cover on the cover; 6.
Avoid external forces hitting the equipment; 7.
Prohibit chemicals from touching this equipment; 8.
Check the circuit control system before each boot; 9.
Confirmation of power supply and grounding wire; 10.
Whether the power cord is properly connected according to the specifications and is indeed grounded; 11.
Ventilation fans should be installed in the laboratory to maintain indoor ventilation; 12.
The wastewater discharge system of the equipment must be installed in place; 13.
After the end of the test, cut off the power supply of the whole machine; 14.
After the end of each test, the sample should be removed and the equipment liner should be cleaned; 15.
The equipment shall be operated
by personnel.