Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Article 40 of the "Regulations on the Quality Management of Construction Projects" of the State Council provides:
"Under normal conditions of use, the minimum warranty period for construction projects: the waterproofing of roofing works, toilets with waterproof requirements, the anti-leakage of rooms and external walls, is 5 years, and the warranty period is calculated from the date of completion and acceptance.
So, how long can the warranty period of bathroom waterproofing be?
In fact, the waterproof quality guarantee period of the toilet is related to the waterproof design, material selection and construction technology.
So, how does ORIENTAL YUHONG's waterproof repair service do it?
The answer is: standardized construction process + ORIENTAL YUHONG waterproof high-performance waterproof products.
Standardized construction process
The rough house can be waterproofed after the water and electricity transformation is completed.
For waterproof construction, the first step is to clean the base layer.
Secondly, the arcing of the inner corner and the root of the pipe and the additional mesh cloth of the paint are all to enhance the waterproof effect of the detailed nodes.
Then large-scale construction, it is recommended to choose flexible waterproof coating for new house decoration, which can adapt to the settlement and deformation of the structure without cracking.
When painting, make sure not to miss the application.
Follow the principle of thin application and multiple passes.
Each coat must be completely dry before the next coat.
The final film thickness is in accordance with the "Residential Indoor Waterproof Technical Specification" JGJ298-2013 According to regulations, when waterproof coatings are used in indoor waterproofing projects, the thickness of the waterproof layer of the coating film should be ≥1.
5mm on the horizontal plane and ≥1.
2mm on the vertical plane.
Closed water test
Finally, the closed-water acceptance is carried out.
After the acceptance is passed, everything is not going to be all right, because the waterproofing is completed and other decoration processes are not completed.
In order to avoid cross-working during the decoration process from damaging the waterproof layer, a cement mortar must be made on the waterproof layer.
Floor.
and so,
The service life of the waterproof layer of your bathroom,
It is your choice that has the final say!