-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Global Coatings Network News:
Global Coatings Network News:1.
Sankeshu Coating Co.
Three trees
The business scope of Sankeshu Paint Co.
Fujian Sanjiang Packaging Co.
Putian Sankeshu Paint Trading Co.
Tianjin Sankeshu Paint Co.
Putian Hesan Investment Co.
In strict accordance with the "three simultaneous" requirements of the construction project, Sankeshu determines the stable and up-to-standard discharge and discharge standards of various environmental factors, improves various environmental protection facilities, supporting dust and gas removal facilities in the workshop, establishes sewage treatment stations, and regulates solid waste For the construction of the storage yard, measures such as windproof, rainproof, anti-leakage and anti-loss measures shall be adopted.
(1) Dust removal and degassing device: Wood paint workshops A and B, adhesive workshops, and resin workshops all adopt sink flow dust removal + activated carbon adsorption regeneration devices, which can effectively remove the "triphenyl" and particulate matter in the exhaust gas, and pass The activated carbon regeneration method realizes recycling.
(2) Sewage treatment station: Reactor cleaning wastewater, workshop floor washing wastewater, laboratory wastewater, and workshop staff domestic sewage are treated by the existing sewage treatment station in the factory, and discharged into the municipal sewage pipe network after the treatment reaches the standard, and merged into Minzhong Sewage treatment plant for further treatment.
Through the above-mentioned environmental protection measures, the company's sewage and waste gas have reached the emission standards approved by the environmental assessment after treatment, and the noise at the factory boundary has also reached the corresponding environmental protection requirements.
2.
Sanjiang Packaging strictly follows the "three simultaneous" requirements of the construction project, determines the stable and up-to-standard emission and emission standards of various environmental factors, improves various environmental protection facilities, and the workshop is equipped with 3 sets of gas gathering and collection systems.
3.
Tianjin Sankeshu strictly follows the "three simultaneous" requirements of the construction project to determine the stable and up-to-standard emission and emission standards of various environmental factors, and improve various environmental protection facilities.
The workshop is equipped with 2 sets of sinking dust collectors to remove dust in the exhaust gas, and discharge after reaching the standard; establish a sewage treatment station to treat production and experimental wastewater, etc.
, and discharge it into the municipal sewage pipe network of the park, and finally discharge it Centralized treatment in Shuangqing Sewage Treatment Plant.
All environmental protection facilities of Tianjin Sankeshu can operate stably, and the synchronous operation rate of the facilities can reach 100%.
3.
Types, quantities and destinations of pollutants discharged
1.
Types, quantities and destinations of pollutants discharged by Sankeshu Paint Co.
, Ltd.
(1) The main pollutants emitted by exhaust gas include: toluene, xylene, particulate matter, SO2, and nitrogen oxides.
Note: Source of test data: Test report of Xiamen Huace Testing Technology Co.
, Ltd.
(2015 Annual Environmental Monitoring Report) Report No.
EDD11H001440a; EDD11H001440b; EDD11H001440c.
(2) After the sewage is treated by the company's sewage treatment station, it is discharged into the municipal sewage pipe network and merged into the Minzhong Sewage Treatment Plant for centralized treatment:
Note: Source of test data: Test report of Xiamen Huace Testing Technology Co.
, Ltd.
(2015 Annual Environmental Monitoring Report) Report No.
EDD11H001440a; EDD11H001440b; EDD11H001440c.
2.
Types, quantities and destinations of pollutants discharged by Fujian Sanjiang Packaging Co.
, Ltd.
The main pollutants emitted by the exhaust gas include: benzene, toluene, and xylene.
Note: Source of test data: Test report of Xiamen Huace Testing Technology Co.
, Ltd.
(2015 Annual Environmental Monitoring Report) Report No.
EDD11H001437.
3.
Types, quantities and destinations of pollutants discharged by Tianjin Sankeshu Paint Co.
, Ltd.
(1) The main pollutants emitted by exhaust gas include: non-methane total hydrocarbons and particulate matter.
Note: Test data source: Tianjin Qingyuan Environmental Monitoring Center Monitoring Report (Jinqing Huanzi (2015) QYFQ No.
027, Jinqing Huanzi (2015) QYFQ No.
026)
(2) After the sewage is treated by the company's sewage treatment station, it is discharged into the municipal sewage pipe network and merged into the Shuangqing sewage treatment plant for centralized treatment:
Note: Source of testing data: Tianjin Qingyuan Environmental Monitoring Center Monitoring Report (Jinqing Huanzi (2015) QYSZ No.
048)
4.
Environmental impact assessment of construction projects and other environmental protection administrative permits
In June 2015, the technical transformation of the resin workshop project was completed and passed the environmental assessment approval.
The existing projects of Sankeshu Coatings Co.
, Ltd.
have fulfilled the environmental impact assessment and the "three simultaneous" system, in line with the Ministry of Environmental Protection and Fujian Province's regulations on the classification and approval of construction project environmental impact assessment documents, and comply with the "Construction Project Environmental Impact Assessment Classification Management List" Requirements.
5.
Emergency plan for environmental emergencies
1.
Sankeshu Paint Co.
, Ltd.
In accordance with the requirements of relevant departments, and with reference to the "Guidelines for the Preparation of Environmental Emergency Response Plans for Petrochemical Enterprises" and the "Methods for Information Reporting of Environmental Emergency" The review has been reported to the Putian Municipal Environmental Protection Bureau for the record.
The company’s emergency plan drills mainly include: (1) Each workshop organizes 2 safety activities a month; (2) A large-scale comprehensive emergency drill is organized at least once a year for key installations and key parts.
Among them: In June 2015, a flammable solvent was held.
Joint emergency rescue drills for leakage, fire rescue and storage tank farms.
2.
Fujian Sanjiang Packaging Co.
, Ltd.
The canning factory organizes safety activities twice a month, involving safety rescue, fire fighting, electric shock first aid, falling from heights, etc.
3.
Tianjin Sankeshu Coating Co.
, Ltd.
Organize 2 safety activities every month, involving fire drills, safety protection, rescue in restricted spaces, leak drills, etc.