Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
From November 7th, 12:58:37 noon, we will officially enter Lidong!
Entering winter, the weather turns cooler, and climatic characteristics such as cold, rainy, and humid appear
At this time, the paint project will encounter many wall problems during construction.
01 Winter construction conditions and requirements
For paint construction, a qualified base has five basic characteristics: firmness, smoothness, dryness, neutrality, and cleanliness
02 Coating construction conditions and requirements
For the construction of internal and external wall latex paint, wood paint, and floor paint, in order to avoid poor film formation and cracking, the construction should be stopped when the following situations occur:
Without the above situation, you can rest assured to construct? too naive! Let's first see if the moisture content of the substrate has been reached?
➤ When constructing internal and external wall latex paint, the wall moisture content is required to be <15% (national requirements <10%); the moisture content of the concrete base layer is <8%
➤ When applying wood paint, the moisture content of the wood should be less than 12%
Regarding the construction of exterior wall coatings, due to construction period requirements, some projects still need to be constructed when the temperature is lower than 5°C after the winter.
1 Primary inspection and treatment
Grassroots treatment is the foundation of the painting project.
Remove dust, oil and loose objects on the surface of the base layer; reduce or eliminate surface defects; improve the physical or chemical properties of the surface of the base layer
2 Putty construction
For the construction of the coating system, the substrate should be dry and the wall surface temperature should be ensured before the construction in winter
When the daytime temperature is lower than 5℃, try to work on the wall with direct sunlight.
3 Polish the putty and judge the dryness
The putty must be completely dried before polishing, so that the putty is completely dried and the non-stick sandpaper is polished and the surface smoothness is controlled
.
If the putty does not dry or is frozen, the putty will stick to the sandpaper when sanding, and the surface will not be easy to smooth
.
4 Paint construction
Coating construction: Make sure that the substrate is completely dry before painting.
The construction temperature of water-based coatings should be controlled above 5℃.
During the drying and filming process, when the temperature is below zero, the emulsion will freeze and lose its adhesion and film-forming functions.
, To ensure that the lowest temperature during the film-forming and drying process cannot be lower than 0°C
.
5 Storage of paint
In the winter paint construction, the paint stored on site should be placed in the indoor classification and storage, and ensure that the indoor temperature is above 0℃.
When the temperature is below 0℃, heating or electric heating must be used to increase the indoor temperature
.
Open flames are strictly prohibited to increase the indoor temperature .
Paint that has not been used up during construction should be placed indoors, and products that have been frozen cannot be used again
.
6 Paint film maintenance and finished product protection
It takes 7 days for the paint film to dry and achieve the best performance on the surface of the object at a standard temperature of 25℃.
When the temperature of the coating construction environment is generally low in winter, the time for the paint film to dry and achieve the best performance should be relatively extended.
During this period, it is necessary to minimize the pollution and bumps on the surface of the paint film, so as to prevent the repair caused by pollution and bumps from affecting the overall effect
.
In winter, construction should be carried out according to the construction conditions of the site, and corresponding protective measures must be taken to avoid freezing of the coating film as much as possible
.
To ensure the smooth progress of the project coating quality and construction schedule
.