-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
Notice on the use of water-based architectural coatings and polymer waterproof materials in government-invested projectsNotice on the use of water-based architectural coatings and polymer waterproof materials in government-invested projectsChengdu Housing and Urban-Rural Construction Bureau on the use of water-based architectural coatings and polymer waterproof materials in government-invested projects Notice [2021] -274 No.
274 1.
Scope of application The government investment projects involving outdoor spraying, painting, waterproofing, marking and marking operations on construction sites within the administrative area of this city shall all use water-based architectural coatings, high Molecular waterproofing material coatings online coatingol.
com .
All government-invested projects involving VOCs emission processes such as outdoor spraying, painting, waterproofing, marking and marking operations within the administrative area of this city shall use water-based architectural coatings and polymer waterproof material coatings online coatingol.
com .
Coating online coatingol.
com II.
Implementation of the main responsibility of the enterprise .
Before June 1, the project that has passed the drawing review and filed but has not implemented the relevant operating procedures, the construction unit shall take the lead in organizing the relevant responsible entities to carry out the investigation, and supervise the design unit to implement the full use of water-based water through design changes Architectural coatings and polymer waterproofing materials, supervise construction units to use water-based architectural coatings and polymer waterproofing materials in the construction process, and take the lead in the inspection of water-based architectural coatings and polymer waterproofing materials and construction requirements during the completion acceptance stage.
Before June 1st, for projects that have passed the drawing review and filed but have not implemented the relevant operating procedures, the construction unit shall take the lead in organizing the relevant responsible entities to carry out the investigation, supervise the design unit to implement the full use of water-based architectural coatings and polymer waterproof materials through design changes, and supervise the construction unit All water-based architectural coatings and polymer waterproofing materials are used in the construction process, and the inspection of water-based architectural coatings and polymer waterproofing materials and construction requirements are conducted at the completion acceptance stage.
Government investment projects that carry out construction drawing review after June 1, 2021 shall strictly implement the requirements for the use of water-based architectural coatings and polymer waterproof materials in government investment projects.
The design unit shall indicate in the construction drawing design documents of the construction project, and the drawing review shall The agency will check during the review of construction drawings and design documents.
Government investment projects that carry out construction drawing review after June 1, 2021 shall strictly implement the requirements for the use of water-based architectural coatings and polymer waterproof materials in government investment projects.
The design unit shall indicate in the construction drawing design documents of the construction project, and the drawing review shall The agency will check in the review of construction drawings and design documents.
Establish a purchase ledger for construction materials such as water-based architectural coatings and polymer waterproof materials.
Establish a purchase ledger for construction materials such as water-based architectural coatings and polymer waterproof materials.
For those who have not used water-based architectural coatings or polymer waterproof materials for construction, order rectification and refuse In case of rectification, report to the construction unit and the competent department of the industry for not using water-based architectural coatings or polymer waterproof materials for construction, and order rectification, and if the rectification is refused, report to the construction unit and the competent department of the industry.
3.
Implement government supervision responsibility for water-based architectural coatings , The use of polymer waterproof materials is included in daily inspections, and the non-compliance is ordered to rectify, and serious cases are investigated in accordance with laws and regulations, and included in credit management.
The use of water-based architectural coatings and polymer waterproof materials is included in daily inspections.
Order for rectification if it does not meet the requirements, investigate and deal with the law and regulations if the circumstances are serious, and bring it into credit management
274 1.
Scope of application The government investment projects involving outdoor spraying, painting, waterproofing, marking and marking operations on construction sites within the administrative area of this city shall all use water-based architectural coatings, high Molecular waterproofing material coatings online coatingol.
com .
All government-invested projects involving VOCs emission processes such as outdoor spraying, painting, waterproofing, marking and marking operations within the administrative area of this city shall use water-based architectural coatings and polymer waterproof material coatings online coatingol.
com .
Coating online coatingol.
com II.
Implementation of the main responsibility of the enterprise .
Before June 1, the project that has passed the drawing review and filed but has not implemented the relevant operating procedures, the construction unit shall take the lead in organizing the relevant responsible entities to carry out the investigation, and supervise the design unit to implement the full use of water-based water through design changes Architectural coatings and polymer waterproofing materials, supervise construction units to use water-based architectural coatings and polymer waterproofing materials in the construction process, and take the lead in the inspection of water-based architectural coatings and polymer waterproofing materials and construction requirements during the completion acceptance stage.
Before June 1st, for projects that have passed the drawing review and filed but have not implemented the relevant operating procedures, the construction unit shall take the lead in organizing the relevant responsible entities to carry out the investigation, supervise the design unit to implement the full use of water-based architectural coatings and polymer waterproof materials through design changes, and supervise the construction unit All water-based architectural coatings and polymer waterproofing materials are used in the construction process, and the inspection of water-based architectural coatings and polymer waterproofing materials and construction requirements are conducted at the completion acceptance stage.
Government investment projects that carry out construction drawing review after June 1, 2021 shall strictly implement the requirements for the use of water-based architectural coatings and polymer waterproof materials in government investment projects.
The design unit shall indicate in the construction drawing design documents of the construction project, and the drawing review shall The agency will check during the review of construction drawings and design documents.
Government investment projects that carry out construction drawing review after June 1, 2021 shall strictly implement the requirements for the use of water-based architectural coatings and polymer waterproof materials in government investment projects.
The design unit shall indicate in the construction drawing design documents of the construction project, and the drawing review shall The agency will check in the review of construction drawings and design documents.
Establish a purchase ledger for construction materials such as water-based architectural coatings and polymer waterproof materials.
Establish a purchase ledger for construction materials such as water-based architectural coatings and polymer waterproof materials.
For those who have not used water-based architectural coatings or polymer waterproof materials for construction, order rectification and refuse In case of rectification, report to the construction unit and the competent department of the industry for not using water-based architectural coatings or polymer waterproof materials for construction, and order rectification, and if the rectification is refused, report to the construction unit and the competent department of the industry.
3.
Implement government supervision responsibility for water-based architectural coatings , The use of polymer waterproof materials is included in daily inspections, and the non-compliance is ordered to rectify, and serious cases are investigated in accordance with laws and regulations, and included in credit management.
The use of water-based architectural coatings and polymer waterproof materials is included in daily inspections.
Order for rectification if it does not meet the requirements, investigate and deal with the law and regulations if the circumstances are serious, and bring it into credit management