-
Categories
-
Pharmaceutical Intermediates
-
Active Pharmaceutical Ingredients
-
Food Additives
- Industrial Coatings
- Agrochemicals
- Dyes and Pigments
- Surfactant
- Flavors and Fragrances
- Chemical Reagents
- Catalyst and Auxiliary
- Natural Products
- Inorganic Chemistry
-
Organic Chemistry
-
Biochemical Engineering
- Analytical Chemistry
-
Cosmetic Ingredient
- Water Treatment Chemical
-
Pharmaceutical Intermediates
Promotion
ECHEMI Mall
Wholesale
Weekly Price
Exhibition
News
-
Trade Service
China Paint Network
News: April 3 morning, Changchun City netizens posted on Weibo: "This morning at the intersection of Yatai Street and South Lake Road, under the elevated bridge dropped a lot of debris, who dare to run up the elevated." "In the picture sent by the netizen, a pile of debris fell in the parking lot under the bridge of an elevated bridge, but it was not clear what material was made up.
On the morning of April 3, the new culture reporter came to Yatai Street under the South Lake Road elevated bridge, in the south and south sides of the South Lake Road under the bridge parking lot, did not find the debris, should have been cleaned. There are several places at the bottom of the bridge that resemble wall peels off, but the area where the slag drops in the picture is under the telescopic seam, which is not under the telescopic seam.
Changchun City Construction Commission, a staff member at the bridge said: "The place where the slag fell, we have to deal with, found that these slag is the winter for the telescopic seam drainage pipe for the use of benzene plate, was crushed by the car, the end should be stuffed into the drainage pipe mouth, this rain and snow weather, the water from the drainage pipe brought down." These benzene plates are not part of the bridge, and the broken benzene plates have no effect on the bridge at all.
for several other bridge bottom slag, staff said that this is
paint
layer cracked, there is no impact on the bridge body, we can safely drive from the bridge.